My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
05/10/2016 (2)
CBCC
>
Meetings
>
2010's
>
2016
>
05/10/2016 (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/7/2020 12:26:50 PM
Creation date
8/10/2016 12:23:11 PM
Metadata
Fields
Template:
Meetings
Meeting Type
BCC Regular Meeting
Document Type
Agenda Packet
Meeting Date
05/10/2016
Meeting Body
Board of County Commissioners
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
175
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
WON <br />INDIAN RIVER COUNTY, FLORIDA <br />BOARD MEMORANDUM <br />TO: Joseph A. Baird, <br />County Administrator <br />THROUGH: Christopher R. Mora, P.E. <br />Public Works Director <br />THROUGH: Rich ard'B.'Szpyrka, P.E. <br />Assistant Public Works Director <br />(;; <br />FROM: James D. Gray, Jr. <br />Coastal Engineer <br />SUBJECT: Work Order No. 13 CB&1 Coastal Planning and Engineering, Inc. <br />Sector 3 Beach Restoration Project <br />2016 Post Construction Physical Monitoring Services <br />DATE: April 27, 2016 <br />DESCRIPTION AND CONDITIONS <br />On March 19, 2013 the Board approved a contract with CB&I Coastal Planning and Engineering, <br />Inc. (CB&I) for professional coastal engineering services in Indian River County for a two-year <br />term, 2013-2015. On March 17, 2015 the Board renewed the contract until March 19, 2017. <br />CB&I is the selected County consultant for professional physical monitoring services related to <br />the Sector 3 Beach Restoration Project and Sector 3 Dune Repair Project. <br />The proposed Work Order No. 13 provides year 2016 post construction physical monitoring <br />services to document the fill performance of the Sector 3 Beach Restoration Project Area. By <br />Permit, annual Post Construction Physical monitoring is required following a large scale beach <br />restoration project. The 2016 monitoring entails the following: <br />• "Year 5" annual post construction physical monitoring of the Phase 2 project area <br />• "Year 1" annual post construction physical monitoring for the Sector 3 Dune Repair <br />project area <br />Work Order No. 13 totals a lump sum amount of $49,953.30. <br />All subsequent annual physical monitoring of the Sector 3 Project area will be addressed through <br />future work orders. <br />FAPublic Works\JamesG\Sector 3\CPE Work Orders\Work Order No. 13 - 2016 Physical Monitoring Sector 3\agenda <br />item Coastal Planning and Engineering Work Order 13 -- 4-25-16.docx <br />40 <br />
The URL can be used to link to this page
Your browser does not support the video tag.