My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
05/10/2016 (2)
CBCC
>
Meetings
>
2010's
>
2016
>
05/10/2016 (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/7/2020 12:26:50 PM
Creation date
8/10/2016 12:23:11 PM
Metadata
Fields
Template:
Meetings
Meeting Type
BCC Regular Meeting
Document Type
Agenda Packet
Meeting Date
05/10/2016
Meeting Body
Board of County Commissioners
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
175
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Exhibit 1 <br />March 21, 2016 <br />James Gray <br />Indian River County <br />Public Works - Coastal Engineering Division <br />1801 27th St, Building A <br />Vero Beach, FL 32960 <br />Subject: Work Order #13 <br />Dear James: <br />CB&I Coastal Planning & Engineering, Inc. <br />2481 NW Boca Raton Blvd. <br />Boca Raton, FL 33431 <br />Tel: +1 561 391 8102 <br />Fax: +1 561 391 9116 <br />www CBI com <br />Indian River County Sector 3 Beach Restoration Project and Dune Repair Project <br />Post Construction Physical Monitoring Services - 2016 <br />This proposal outlines a scope of work for CB&I Coastal Planning & Engineering, Inc. (CB&I), f/k/a Coastal <br />Planning & Engineering, Inc. to provide services in support of one year of annual physical monitoring to fulfill <br />FDEP and USACE permit requirements of the Sector 3 Beach and Dune Restoration Project constructed between <br />2010 and 2012 and the Sector 3 Dune Repair Project constructed 2014/2015. This proposal also includes a third <br />party peer review of the UMAM Analysis -performed by CSA, and if necessary, quantification of hardbottom <br />impacts. <br />The 2016 Physical Monitoring Services entails the following: <br />"Year 5" annual post construction physical monitoring of the Phase 2 project area (R-26+500 — R-36), <br />"Year 1" annual post -construction physical monitoring for the Sector 3 Dune Repair Project Area (R-24 — <br />R-55). <br />Physical Monitoring Report <br />The Indian River County Sector 3 Beach Restoration Project and Dune Repair Project were constructed under <br />permitting authority of the Florida Department of Environmental Protection (FDEP) and United States Army <br />Corps of Engineers (USACE). These permits (FDEP permit No. 0285993 -001 -JC, FDEP permit modification No. <br />0285993 -008 -JN, USACE permit SAJ-2007-01645, and USACE permit modification SAJ-2007-01645(MOD- <br />AWP)) contain permit conditions pertaining to construction and post -construction periods. FDEP permit <br />condition 56 (d) requires an engineering report be submitted to the FDEP within 90 days following completion of <br />each post -construction survey. <br />We understand that Morgan & Eklund will perform the physical monitoring from R-30 to R-60, and be <br />responsible for certifying the survey data and submitting a survey report to the FDEP. Land & Sea Surveying <br />Concepts, Inc., via a separate contract with the Sebastian Inlet District, will perform the physical monitoring from <br />R-15 to R-30. They will certify the survey data and submit a separate survey report to the FDEP. CB&I will <br />review both data sets to ensure that it conforms to the standards required by the FDEP physical monitoring plan. <br />CB&I will notify the County of any issues with the survey data and will participate in a conference call with the <br />County, Morgan & Eklund, and Land & Sea Concepts to discuss any issues. <br />43 <br />
The URL can be used to link to this page
Your browser does not support the video tag.