My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
05/17/2016 (3)
CBCC
>
Meetings
>
2010's
>
2016
>
05/17/2016 (3)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/7/2020 12:30:48 PM
Creation date
8/10/2016 1:07:07 PM
Metadata
Fields
Template:
Meetings
Meeting Type
BCC Regular Meeting
Document Type
Agenda Packet
Meeting Date
05/17/2016
Meeting Body
Board of County Commissioners
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
124
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
ATTACHMENT "A" <br />BOYS GIRLS CLUB - VERO BEACH EXPANSION <br />Engineer's Cost Estimate <br />1, Aaron Bowles, P.E., a Florida Registered Professional Engineer, License Number 55313, do hereby certify <br />that this cost esimtate has been prepared under my responsible direction for the Water Main <br />Improvements listed below and that the total cost estimated for the said improvements is $17,518 00 <br />This estimate has been prepared, in part, for estimating the value of utilities to be dedicated to the City of <br />Vero Beach, installed in substantial conformance with the approved Utility Construction Plans for the Boys <br />& Girls Club - Vero Beach expansion dated and approved by the City of Vero Beach Utility Department on <br />March 13, 2015 <br />ti \ .Is <br />_ 4r • `�:5 �. ��c � �;� b l J Ili <br />Aaron Bowles, <br />5E.,��.LUs9� 0` Date <br />Item Quantity <br />I Unit Unit Cost Total Cost <br />Water Improvements <br />1. 6" Tapping sleeve, 6" Tapping <br />Valve & Tap <br />1 <br />LS <br />$ 3,400.00 <br />$ 3,400.00 <br />2. 6" PVC WM and RTGs <br />322 <br />LF <br />$ 21.00 <br />$ 6,762.00 <br />a. 6" Gate Valve <br />1 <br />each <br />b. 6" Tee <br />2 <br />each <br />c. 6" 900 Bend <br />3 <br />each <br />d. 6" x 4" Reducer <br />1 <br />each <br />e. 4" 900 Bend <br />2 <br />each <br />3. 2" Water Service <br />1 <br />LS <br />$ 4,180.00 <br />$ 4,180.00 <br />4.4" C-900 WM <br />8 <br />LF <br />$ 22.00 <br />$ 176.00 <br />5. Fire Hydrant <br />1 <br />each <br />$ 3,000.00 <br />$ 3,000.00 <br />Water Subtotal. <br />$ 17,518.00 <br />* cost is included in the amount of line item 2 <br />WATER TOTAL $17,518.00 <br />32 <br />
The URL can be used to link to this page
Your browser does not support the video tag.