My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2016-104B
CBCC
>
Official Documents
>
2010's
>
2016
>
2016-104B
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/15/2016 4:15:12 PM
Creation date
8/15/2016 4:14:25 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Agreement
Approved Date
07/12/2016
Control Number
2016-104B
Agenda Item Number
8.L.
Entity Name
Blue Goose Construction
Subject
Water Treatment Plant South County
Area
Well No. 7
Bid Number
2016032
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
18
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
D. CONTRACTOR has obtained and carefully studied (or assumes responsibility for having <br />done so) all additional or supplementary examinations, investigations, explorations, tests, <br />studies, and data concerning conditions (surface, subsurface, and Underground Facilities) <br />at or contiguous to the Site which may affect cost, progress, or performance of the Work or <br />which relate to any aspect of the means, methods, techniques, sequences, and procedures <br />of construction to be employed by CONTRACTOR, including applying the specific means, <br />methods, techniques, sequences, and procedures of construction, if any, expressly required <br />by the Contract Documents to be employed by CONTRACTOR, and safety precautions and <br />programs incident thereto. <br />E. CONTRACTOR does not consider that any further examinations, investigations, <br />explorations, tests, studies, or data are necessary for the performance of the Work at the <br />Contract Price, within the Contract Times, and in accordance with the other terms and <br />conditions of the Contract Documents. <br />F. CONTRACTOR is aware of the general nature of work to be performed by OWNER and <br />others at the Site that relates to the Work as indicated in the Contract Documents. <br />G. CONTRACTOR has correlated the information known to CONTRACTOR, information and <br />observations obtained from visits to the Site, reports and drawings identified in the Contract <br />Documents, and all additional examinations, investigations, explorations, tests, studies, and <br />data with the Contract Documents. <br />H. CONTRACTOR has given OWNER written notice of all conflicts, errors, ambiguities, or <br />discrepancies that CONTRACTOR has discovered in the Contract Documents, and the <br />written resolution thereof by OWNER is acceptable to CONTRACTOR. <br />I. The Contract Documents are generally sufficient to indicate and convey understanding of <br />all terms and conditions for performance and furnishing of the Work. <br />ARTICLE 8 - CONTRACT DOCUMENTS <br />8.01 The Contract Documents consist of the following: <br />A. This Agreement <br />B. Certificate of Liability Insurance <br />C. Invitation to Bid 2016032 <br />D. Addenda (numbers 1 to 1 , inclusive); <br />E. CONTRACTOR'S Bid Form <br />F. Bid Bond <br />G. 00431 Schedule of Subcontractors <br />H. 00452 Sworn Statement Under Section 105.08, Indian River County Code, on Disclosure <br />of Relationships <br />Section 00530-6 <br />
The URL can be used to link to this page
Your browser does not support the video tag.