Laserfiche WebLink
Indian River County Department of Utilities <br />Gordon Sparks, P.E. Environmental Engineer <br />Project : Pinson Water Assessment Project <br />Date: July 29, 2016 <br />Preliminary Cost Estimate - 15 Water Services <br />II <br />LABOR COST (USD) I <br />MATERIAL COST (USD) <br />Bid <br />Bid Item <br />Estimated <br />Unit of <br />Labor Unit <br />Total Labor <br />Material Unit Total <br />Material <br />Item No. Description <br />Quantity <br />Measure <br />Price <br />Price <br />Price <br />Price <br />1 <br />Mobilization, Demobilization, MOT <br />1 <br />LS <br />10% <br />$2,081.65 <br />2 <br />Install 6" PVC Water Main <br />860 <br />LF <br />6.00 <br />$5,160.00 <br />10.00 <br />$8,600.00 <br />3 <br />Install 2" PVC Water Main <br />30 <br />LF <br />4.80 <br />$144.00 <br />1.24 <br />$37.20 <br />4 <br />Install 6" GV&B <br />1 <br />EA <br />125.00 <br />$125.00 <br />650.00 <br />$650.00 <br />` 5 <br />Driveway Bores <br />30 <br />LF <br />30.00 <br />$900.00 <br />6 <br />Asphalt Repair of Trench <br />50 <br />SY <br />25.00 <br />$1,250.00 <br />10.00 <br />$500.00 <br />7 <br />Install Mechanical Restrained Joint DI Fittings <br />0.25 <br />TON <br />4,100.00 <br />$1,025.001 <br />3,500.00 <br />$875.00 <br />` 8 <br />Install Fire Hydrant Assemb w/ 6" GV&B <br />1 <br />EA <br />2,000.00 <br />$2,000.001 <br />2,000.00 <br />$2,000.00 <br />9 <br />Install 8" X 6" Wet Tap w/ Tapping Valve <br />1 <br />EA <br />900.00 <br />$900.001 <br />1,200.00 <br />$1,200.00 <br />install water Nervice - Single bnort w/ roKe ana <br />10 <br />Box <br />1 <br />I <br />300.00 <br />$300.001 <br />300.00 <br />$300.00 <br />Install Water Service - Single Long w/ Yoke and <br />11 <br />Box <br />4 <br />EA <br />425.00 <br />$1,700.001 <br />300.00 <br />$1,200.00 <br />Install Water Service - Double Short w/ Yoke and <br />! <br />12 <br />Box <br />2 <br />350.00 <br />$700.00- <br />510.00 <br />$1,020.00 <br />13 <br />Box <br />3 <br />I <br />EA <br />350.00 <br />$1,050.00 <br />570.00 <br />$1,710.00 <br />14 <br />Install Temp. Jumper <br />1 <br />EA , <br />$500.00 <br />$500.00: <br />500.00 <br />$500.00 <br />Fill, Pressure Test, Chlorinate and Flush Water <br />15 <br />Main <br />890 <br />LF <br />$1.50 <br />$1,335.00 <br />0.10 <br />$89.00 <br />16 <br />Install Sample Point (Using Water Service) <br />3 <br />EA <br />$275.00 <br />$825.00 <br />275.00 <br />$825.00 <br />17 <br />Take Bacterial Sample/Deliver to Lab for Testing <br />6 <br />EA <br />$150.00 <br />$900.00 <br />18 <br />Lawn Restoration (Topsoil and Bahia Sod) <br />890 <br />SY <br />$2.25 <br />$2,002.50 <br />1.80 <br />$1,602.00 <br />Subtotal Water System <br />$22,898.15 <br />$21,108.20 <br />19 <br />IRCDUS Contingency Account <br />1 <br />I EA <br />10% <br />$2,289.80 <br />$2,110.80 <br />1 <br />Subtotals = <br />I <br />$25,187.95 <br />$23,219.00 <br />Constr. Total <br />$48,406.95 <br />Total Assessment Cost Estimate I <br />$48,406.95 <br />F:\Utilities\UTILITY - Engineering\Projects - Assessment Projects\OOOAssessments_2016_Proposed\PinsonSubdivision\PINSON <br />SUBDIVISION Water Assessment Project\Cost Estimate by Labor <br />Contract.xlsx <br />