My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2016-123
CBCC
>
Official Documents
>
2010's
>
2016
>
2016-123
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/22/2016 1:50:55 PM
Creation date
8/22/2016 1:50:54 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Work Order
Approved Date
08/16/2016
Control Number
2016-123
Agenda Item Number
8.KK.
Entity Name
REI Engineers
Subject
Work Order No.3 Design and replacement of Health Dept. roof
Area
1900 27th St.
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
5
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
REI Proposal'No.P16TPA-011 <br /> August 2,2016 <br /> Page 3 <br /> J. Upon notification by the contractor that the job is fully complete,a final inspection will be <br /> conducted with REI, contractor and Owner personnel. A final inspection report will be <br /> submitted upon verifying completion or if necessary, an additional punch list will be <br /> prepared. <br /> K. Upon completion of work,verify compliance of warranties,close out documents,and final <br /> billing,before forwarding to the Owner. <br /> M. PROPOSED SCOPE OF WORK <br /> A. Remove existing roof system down to the existing steel (Sectors D &H) and lightweight <br /> insulating concrete deck and provide new roof system along with sheet metal flashing and <br /> accessories to provide a complete, watertight, 20-year warrantable roof assembly. Roof <br /> system selected will be submitted to Owner for approval. <br /> B. Perform window/glazing and stucco wall repairs as outlined in REI's Report "Envelope <br /> Condition Assessment for IRC Health Department"dated August 28, 2015. <br /> IV. ENGINEERING FEES <br /> A. Based on the anticipated scope of work for this project,the proposed engineering fees are: <br /> Contract Review Documents........................................................................$8,950 <br /> Contract Final Documents............................................................................$6,350 <br /> BiddingPhase...............................................................................................$1,500 <br /> Construction Administration.......................................................................$10,100 <br /> Closeout........................................................................................................$1,500 <br /> TotalEngineering Budget.....................................................................................$28,400 <br /> V. PROJECT SCHEDULE <br /> A. Preliminary Contract Documents shall be completed within 60 days of Notice to Proceed. <br /> Final Contract Documents shall be completed and sealed within 10 days of receipt of <br /> comments. <br /> B. Construction Administration shall be performed during the estimated construction duration <br /> and the project closeout process. This work is expected to take 75 calendar days. <br /> If this proposal meets with your approval,please notify us in writing. This proposal will remain firm for a <br /> period of thirty (30) days. After that time, we reserve the right to review scheduled commitments and <br /> prices. <br /> If you have any questions regarding this matter,please do not hesitate to call. <br /> Respectfully submitted, <br /> REIEngineers <br /> Randy Moore Jr., EI Kenneth Tyner,PE,RRC <br /> Project Manager Executive Vice President <br />
The URL can be used to link to this page
Your browser does not support the video tag.