My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2016-129
CBCC
>
Official Documents
>
2010's
>
2016
>
2016-129
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/13/2016 10:37:18 AM
Creation date
8/22/2016 2:23:11 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Work Order
Approved Date
08/16/2016
Control Number
2016-129
Agenda Item Number
8.QQ.
Entity Name
Masteller & Moler
Subject
Courthouse Judges Security Upgrade
Work Order No.2 Additional Amendment
Gate/Pedistrian Door
Area
IRC Courthouse
Project Number
1621
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
8
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
i <br /> fT' ti.• <br /> Board of County Commissioners - <br /> 1801 27th Street <br /> Vero Beach, Florida 32960 <br /> Telephone: (772)567-8000 FAX: 772-778-9391 <br /> Project: <br /> WORK ORDER NO. 2 (Engineering) <br /> FOR _. <br /> PROFESSIONAL SERVICES AGREEMENT <br /> FOR PROFESSIONAL CIVIL ENGINEERING SERVICES CONTRACT <br /> WITH <br /> Masteller & Moler, Inc. <br /> IRC COURTHOUSE JUDGES SECURITY UPGRADE — <br /> IRC Project No. 1621 <br /> This Work Order No. 2 is in accordance with the existing AGREEMENT dated November 15, <br /> 2011 as amended November 4th, 2014 between Masteller & Moler, Inc (ENGINEER) and Indian <br /> River County (COUNTY). This Work Order No. 2 amends the agreement as follows: <br /> SECTION I - PROJECT LIMITS <br /> This Work Order No 2 is for the ENGINEER to perform professional engineering services in <br /> connection with the planning, design, and permitting of Security Gates / Modified Wall Facilities <br /> for the "IRC Courthouse Judges Security Upgrade" project at the County Courthouse. <br /> Along the east side of the existing Courthouse facility there exists an off-street parking facility <br /> reserved for judge's parking. Currently, the off-street parking facility is not equipped with <br /> security features to deter unwanted access. In addition, there was a security gate at the <br /> entrance /exit, however, it has been partially dismantled and is not operational It is understood <br /> the County desires to modify the east judge's parking lot to improve security along with several <br /> other features as follows. <br /> 1 Extend the existing 30.5" Concrete Block Wall up to same 9'1" ± height as existing north wall, <br /> 2. Add entry and exit remote operation rolling security gates, <br /> 3 Add a solid pedestrian door in the south wall; and <br /> 4. Remove the drainage wall within the Judges' Parking area and extend at grade parking area <br /> to building. <br /> The project site has a land use designation MX (Mixed use) according to Official Future Land Use <br /> Map of the City of Vero Beach. The site has an underlying zoning district designation DTW <br /> (Downtown District) according to City of Vero Beach Zoning Maps According to Section 62 312 — <br /> Walls and Fences (4) of the City of Vero Beach Zoning Code "Where a wall or fence is erected <br /> along or parallel to any street, such wall or fence is permitted up to a maximum height of three <br /> feet in height". Information on the original Courthouse construction plans suggests the existing <br /> wall is setback beyond the front yard setback. If this proves to be accurate, it is our understanding <br /> from the City of Vero Beach a variance would not be required to raise the wall to 9'-1"± tall. <br /> SECTION II -SCOPE OF SERVICES <br /> As agreed upon between ENGINEER and the COUNTY, the ENGINEER shall provide Professional <br /> i <br />
The URL can be used to link to this page
Your browser does not support the video tag.