My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2016-129
CBCC
>
Official Documents
>
2010's
>
2016
>
2016-129
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/13/2016 10:37:18 AM
Creation date
8/22/2016 2:23:11 PM
Metadata
Fields
Template:
Official Documents
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
8
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
M MASTELLER & MOLER, INC. <br /> M — CIVIL ENGINEERS <br /> November 29, 2016 <br /> Mr Richard B. Szpyrka, PE, Public Works Director <br /> Indian River County Public Works <br /> 1801 27th Street <br /> Vero Beach, Florida 32960 <br /> RE IRC COURTHOUSE JUDGES SECURITY UPGRADE — IRC Project No. 1621 <br /> Gate/ Pedestrian Door Selection & Design <br /> Professional Engineering Services <br /> Our File #1620LF <br /> Dear Mr Szpyrka <br /> This Amendment is for work necessary to add the gate / pedestrian door selection to the IRC <br /> Courthouse Judges Security Upgrade Project. Under the original approved Work Order No. 2, <br /> the County was going to take responsibility for selection and design of the security gate and <br /> pedestrian gate to be integrated into the project. This Amendment will make the selection and <br /> design of the gate integration the responsibility of the Engineer <br /> Scope of Work. <br /> We will coordinate with a gate security company that manufactures vehicular and <br /> pedestrian security gates to select gates that will properly serve the project. We shall <br /> submit the selected gates to the County for review and acceptance prior to integrating <br /> the gates into the project design It is stipulated the vehicular entrance to the judges <br /> parking area shall be equipped with dual rolling gates operated hydraulically. The <br /> design shall include the selection of an appropriately sized operator and control system <br /> We shall also incorporate into our Construction Plans the replacement of the existing <br /> handicap parking stall at the north end of the site, north of the judge's parking area <br /> We shall provide a construction cost estimate for the proposed improvements upon <br /> completion of the gate design <br /> We will complete the above-described scope of work for the Lump Sum fee of$ 3,200 00 <br /> Upon receipt of executed Amendment No 1, we shall complete the scope of services for <br /> this project on the following schedule <br /> Schedule <br /> 1 Project shall be completed as follows: <br /> Task I — Land Surveying Done <br /> Task II — Design (Civil) / Site Plan Application 20 Working Days <br /> 1655 27th Street, Suite 2 • Vero Beach, Florida 32960 <br /> Phone: (772) 567-5300 • Fax: (772) 794-1106 <br /> mastmolr@bellsouth.net <br />
The URL can be used to link to this page
Your browser does not support the video tag.