Laserfiche WebLink
ORDINANCE 2009-013 <br />D. The location of the subdivision or existing street conditions are <br />such that it is anticipated that sidewalks could not be effectively <br />integrated into an existing or planned sidewalk system; <br />E. The developer provides for an alternate route and/or improvement <br />that adequately accommodates pedestrian traffic and movement <br />and coordinates with existing and planned sidewalks. <br />Decisions by the community development director and the public works director <br />to approve, approve with conditions, or deny an exemption request may be <br />appealed to the planning and zoning commission pursuant to the provisions of <br />section 902.07. Planning and zoning commission decisions regarding exemption <br />requests may be appealed to the board of county commissioners pursuant to the <br />provisions of section 902.07. <br />bd. Method. When required to construct or provide a required sidewalk segment(s), <br />the developer shall: <br />Construct a the required sidewalk segment(s) along a the local internal <br />roadway or etherpedest»easement if the -o i; aesignated as a <br />weeks-dir-eeter—ef the difeeter's appointed designee alternative route <br />approved under section 913.09(5)(b)2.ciiE. As an alternative to coup <br />front" construction, the developer may delay construction by "bonding - <br />out for construction" of the segment(s) as described in subsection <br />913.O9(5)(b)2.ee.—er <br />c- e. Timing. The developer shall be responsible for providing the his required <br />internal sidewalk segment(s) in compliance with subsection 914.15(6)(b)2.b. <br />and 914.15(6)(b)2.bd.i. erg, above prior to receiving an equivalent certificate of <br />occupancy for the project. However, in the event the developer is required to <br />construct the required sidewalk segment(s) (subsection 914.15(6)(b)2.b.i.), the <br />developer may delay construction of the required sidewalk segment(s) for a <br />period of up to two (2) years beyond the date of issuance of an equivalent <br />certificate of occupancy for the project if such delay is needed to accommodate <br />Bold Underline: Additions to Ordinance 11 <br />St-'�n rough: Deleted Text from Existing Ordinance <br />F:\Community Development\Users\CurDev\ORDINANCE\2009\EO 2009-_ 913 - 914 sidewalks.RTF <br />