My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2009-013 Emerg
CBCC
>
Ordinances
>
2000's
>
2009
>
2009-013 Emerg
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/2/2016 11:26:57 AM
Creation date
9/2/2016 11:04:12 AM
Metadata
Fields
Template:
Ordinances
Ordinance Number
2009-013
Adopted Date
09/08/2009
Agenda Item Number
10.A.1.
Ordinance Type
Emergency
State Filed Date
09\11\2009
Code Number
Chapter 913 and 914
Subject
Sidewalk Requirements for Developers and Builders
Codified or Exempt
Codified
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
13
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
ORDINANCE 2009-013 <br />D. The location of the subdivision or existing street conditions are <br />such that it is anticipated that sidewalks could not be effectively <br />integrated into an existing or planned sidewalk system; <br />E. The developer provides for an alternate route and/or improvement <br />that adequately accommodates pedestrian traffic and movement <br />and coordinates with existing and planned sidewalks. <br />Decisions by the community development director and the public works director <br />to approve, approve with conditions, or deny an exemption request may be <br />appealed to the planning and zoning commission pursuant to the provisions of <br />section 902.07. Planning and zoning commission decisions regarding exemption <br />requests may be appealed to the board of county commissioners pursuant to the <br />provisions of section 902.07. <br />bd. Method. When required to construct or provide a required sidewalk segment(s), <br />the developer shall: <br />Construct a the required sidewalk segment(s) along a the local internal <br />roadway or etherpedest»easement if the -o i; aesignated as a <br />weeks-dir-eeter—ef the difeeter's appointed designee alternative route <br />approved under section 913.09(5)(b)2.ciiE. As an alternative to coup <br />front" construction, the developer may delay construction by "bonding - <br />out for construction" of the segment(s) as described in subsection <br />913.O9(5)(b)2.ee.—er <br />c- e. Timing. The developer shall be responsible for providing the his required <br />internal sidewalk segment(s) in compliance with subsection 914.15(6)(b)2.b. <br />and 914.15(6)(b)2.bd.i. erg, above prior to receiving an equivalent certificate of <br />occupancy for the project. However, in the event the developer is required to <br />construct the required sidewalk segment(s) (subsection 914.15(6)(b)2.b.i.), the <br />developer may delay construction of the required sidewalk segment(s) for a <br />period of up to two (2) years beyond the date of issuance of an equivalent <br />certificate of occupancy for the project if such delay is needed to accommodate <br />Bold Underline: Additions to Ordinance 11 <br />St-'�n rough: Deleted Text from Existing Ordinance <br />F:\Community Development\Users\CurDev\ORDINANCE\2009\EO 2009-_ 913 - 914 sidewalks.RTF <br />
The URL can be used to link to this page
Your browser does not support the video tag.