My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2009-013 Emerg
CBCC
>
Ordinances
>
2000's
>
2009
>
2009-013 Emerg
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/2/2016 11:26:57 AM
Creation date
9/2/2016 11:04:12 AM
Metadata
Fields
Template:
Ordinances
Ordinance Number
2009-013
Adopted Date
09/08/2009
Agenda Item Number
10.A.1.
Ordinance Type
Emergency
State Filed Date
09\11\2009
Code Number
Chapter 913 and 914
Subject
Sidewalk Requirements for Developers and Builders
Codified or Exempt
Codified
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
13
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
ORDINANCE 2009- 013 <br />2. Sidewalk Internal sidewalk segments(s) along local roadways. <br />a. Responsibility <br />The developer shall be responsible for providing internal sidewalks along <br />internal proiect roadways adiacent to proiect entrances and common areas. <br />These developer -provided sidewalks shall be depicted on the approved <br />proiect preliminary plat and land development permit. <br />The builder/lot owner shall be responsible for providing the sidewalk <br />required along his lot's street frontage, as depicted on the approved proiect <br />preliminary plat and land development permit. The sidewalk segment shall <br />be constructed and inspected prior to the issuance of a Certificate of <br />Occupancy (C.O.) for the residence(s) on the builder's/lot owner's lot. <br />b. Multiple phase proiects <br />In addition to the requirements of 913.09(5)(b)2.a., above, the following <br />requirements shall apply to multiple phase proiects that are under unified <br />control. If a subdivision consists of multiple phases that are under unified <br />control, sidewalks must be completed on ninety percent (90%) of the lots in <br />the preceding phase prior to the issuance of a Certificate of Completion <br />(C C) for the next phase of the proiect: If a certificate of comuletion on a <br />subsequent phase is needed prior to the completion of ninety percent (90%) <br />of the sidewalks in the preceding phase, then security, in conformance with <br />subsection 913.10(1), construction security requirements, shall be posted to <br />guarantee construction of sidewalks needed to meet the 90% completion <br />requirement for the preceding phase. <br />For purposes of calculating the 90% threshold, sidewalks adiacent to lots <br />shall be considered completed if: <br />A valid reservation agreement (as determined by the county attorney) <br />with deposit has been signed by the end user of the lot, or <br />ii. A valid contract (as determined by the county attorney) to build with <br />deposit has been signed by the end user of the lot, or <br />iii. A building permit application has been applied for construction of a <br />residence on the lot. <br />ac. Exemptions. <br />A developer is exempt from providing a required internal sidewalk <br />segment(s) along a local roadway which serves no more than twenty (20) <br />lots and terminates in a cul-de-sac where a future extension of the street <br />beyond the cul-de-sac is not required or possible as determined by the <br />county public works director or the director's appointed designee. <br />Bold Underline: Additions to Ordinance <br />Strike through! Deleted Text from Existing Ordinance <br />F:\Community Development\Users\CurDev\ORDINANCE\2009\EO 2009-_ 913 - 914 sidewalks.RTF <br />
The URL can be used to link to this page
Your browser does not support the video tag.