My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2016-150
CBCC
>
Official Documents
>
2010's
>
2016
>
2016-150
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/23/2016 10:52:42 AM
Creation date
9/23/2016 10:52:41 AM
Metadata
Fields
Template:
Official Documents
Official Document Type
First Amendment
Approved Date
09/20/2016
Control Number
2016-150
Agenda Item Number
8.L.
Entity Name
GFA International Inc.
Subject
Renewal and Amendment No.1 Services Agreement
2016-2018
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
6
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
GFA INTERNATIONAL <br /> 521 N.W.ENTERPRISE DRIVE,PORT ST.LUCIE,FLORIDA 34986 <br /> (772)924-3575 OFFICE - (772)924-3580 FAX <br /> RATESCHEDULE <br /> Indian River County Public Works Department—September 23,2016 to September 22,2018(RFQ 2014007) <br /> SOIL TESTING <br /> Standard or Modified Proctor(sandy soils) ...... .... . .... ................................................. .... . .... ... ........$75.00/ea. <br /> Standard or modified Proctor(limerock/shell)... .. . . .... .. .... ......................................... ...... .. . ... . .......90.00/ea. <br /> Field Density Test(nuclear method)—Minimum 3 tests per trip ................................................... . . .....20.00/ea. <br /> Field Density Test(sand cone method)—Minimum 3 tests per trip . ...... .... ....................................... . . 27.00/ea. <br /> Limerock Bearing Ratio(L.B.R.)............................................................................... .. ....... . . .... . ......... 250.00/ea. <br /> FloridaBearing Value(F.B.V.)........................ ...... ............................................................................. .. . ..25.00/ea. <br /> Sieve Analysis with Hydrometer................................ ......... .............................................................................175.00/ea. <br /> Sieve Analysis for Soil(full gradation including No.200 sieve-does not include hydrometer analysis)65.00/ea. <br /> Sieve Analysis(material finer than No.200 sieve by washing). ...... .... . ......... .... .... ....... . .. ................. 30.00/ea. <br /> Laboratory Permeability Test (sandy soils). ... ........................ .... .................................... .... . .... . .. . ... 85.00/ea. <br /> Atterberg Limits(liquid limit and plastic limit) ....................................................................................... ..95.00/ea. <br /> Chemical Analysis(carbonates of calcium and magnesium) .....................................................................60.00/ea. <br /> MoistureContent.... ..... ........................................................................... .... ................................................25.00/ea. <br /> OrganicContent............................................... ... .... . .. .... .. . . .. . .. . . .. ...... . .... .. .... . .. .... .... . .... .... . .30.00/ea. <br /> Corrosion Series Tests......... . . .............. ....... . . .........................................................................................150.00/ea. <br /> Sampling Trip Charge(if not in conjunction with additional testing)................................................45.00/hr. <br /> CONCRETE TESTING <br /> Concrete Cylinders: (4"x 8"cylinders) slump test,casting,curing and testing.........................................$70.00/set <br /> SlumpTest........ . . . . . . ......................................... .... .... ....... .... . ....................................................... ...... 15.00/hr. <br /> AirContent............... . . .................................... . .... . ......... ....... ............................ ...... . . .......... . .. . .......25.00/ea. <br /> UnitWeight of Concrete........................... . . . . .... ................................. ........ .. ....... . ... . . ....... ........... . 30.00/ea. <br /> Windsor Probe(3 shots per location) ............................ .. . .. . .... . . ... ...................................................150.00/ea. <br /> Swiss Hammer Test(minimum of 3) ....................... . .. . .. ....... ........................................ . .. . .. . .... .... ...50.00/ea. <br /> Field Coring(minimum of 3) ................................. ...................................... . . .. .. . .. .... .... . .... ......... .... 50.00/ea. <br /> Mobilization/Demobilization for Field Coring ... ......................... .. . . . ... .......... ...................75.00/ea. <br /> Compression Testing of Field Cores .......... ........ ............................... . . .. ...................................... .. ... ...30.00/ea. <br /> Mortar Cubes(set of 6) ......................... . ................. . . . . .. .... .. ................ . ....... . .... . .. . .. . . .. ...... ....70.00/set <br /> GroutPrism(set of 3) ................................. ............ .... .... .. . . ..................... ...... .. . ......... .......................75.00/set <br /> ASPHALT TESTING <br /> Stability Tests(Marshall) ............................. . ..................... .. . . .. . .......................... .. ....... ...... . . . ....$130.00/ea. <br /> Bitumen Content(Extraction) .............. . ... .................. . . .... .. . ..................... . .. ......... .... ...................125.00/ea. <br /> Sieve Analysis of Extracted Aggregate ......... ............... .. . .. .... ....................... .... . .. .. .... .......................50.00/ea. <br /> Asphalt Thickness Determination using 2" or 4" Core Drill(minimum of 3) ........................... . . .. ......30.00/ea. <br /> 6"Core Drill(per D.O.T. specs) 1- 10 Cores .................... . . .................................. .... . .............40.00/ea. <br /> AdditionalCores .... . .... ..... ............... .... .............. .... . .. .................. .... .... .. . ...........................30.00/ea. <br /> Mobilization/Demobilization.... . . ............................. .. .. . .......... .. . . .... .. .............. .. . . .75.00 <br /> Specific Gravity of Asphalt Cores for Density Determination .. ............. .... . .... ....................... .. .... . ..25.00/ea. <br /> ENGINEERING SERVICES <br /> ProjectEngineer...... . ........................ . . . ............ . .. . ............ . .. . .. ................ .... ............................... $125.00/hr. <br /> StaffEngineer . ............................................. ... ............. . . ................... .. . .... ........................ .... . . .........85.00/hr. <br /> ProjectManager .... ... . .................... . . . . ............ .... ......... .... .... . ..................... . ............................ ..... 80.00/hr. <br /> SeniorTechnician................. ...... .................. . ........ .... . ................. . .. .. ................ .. . .... ....................... 50.00/hr. <br /> Technician Inspection Services: <br /> RegularTime ........ ...... . ................ . .......... .. ................... .. . .............. .. . .. . .. ............... . .... ... 45.00/hr. <br /> Overtime(5:00pm—7:00am) . ... ........ . ................... ................... . ...................... .... . ................ 55.00/hr. <br /> Overtime(weekends)... .................. ............... ....................................... ....... ....................... . ...... 65.00/hr. <br /> Monitoring of Pile Installation: <br /> RegularTime ............. ................ . ............. .............. ...... .. ......... . ..... . ................... . .................55.00/hr. <br /> Overtime(5:00pm—7:00am)................................... ............................................. .................... ... 65.00/hr. <br />
The URL can be used to link to this page
Your browser does not support the video tag.