Laserfiche WebLink
Geos 6770 South Washington Avenue,Suite 3 <br /> yntecc� Titusville,Florida 32780 <br /> ''1 PH 321.269.5880 <br /> Cons fltants FAX 321.269.5813 <br /> www.eeosyntec.com <br /> 2 September 2016 <br /> Mr. Himanshu H. Mehta, P.E <br /> Managing Director <br /> Solid Waste Disposal District <br /> Indian River County <br /> 132574 1h Avenue SW <br /> Vero Beach, Florida 32968 <br /> Subject: Proposal to Complete Remedial Action Plan Modification Addendum No. 3 Pre- <br /> Injection Investigation and Finalize Bioremediation Design <br /> Former South Gifford Road Landfill <br /> Vero Beach,Indian River County,Florida <br /> Dear Mr. Mehta: <br /> Geosyntec Consultants (Geosyntec) is pleased to submit this letter proposal to the Indian River <br /> County (IRC) Solid Waste Disposal District (SWDD) to provide professional services for Florida <br /> Department of Environmental Protection (FDEP)-required activities associated with continued <br /> implementation of the groundwater monitoring and remedial action for the chlorinated volatile <br /> organic compound (CVOC) plume at the Former South Gifford Road Landfill located in Vero <br /> Beach, Indian River County, Florida(Site). This fee proposal is based on discussions with the IRC <br /> and the pre-injection investigation required by FDEP (as outlined in Remedial Action Plan <br /> Modification Addendum No. 3 [RAPM3], which was approved by the FDEP on 15 July 2016). <br /> RAPM3 presented a bioremediation design and contingent injection event(s) to remediate the <br /> recalcitrant CVOC groundwater impacts in the former source area (vicinity of monitoring well <br /> GR-MW30B). Prior to implementation of the bioremediation design, and as outlined in RAPM3, <br /> a limited pre-injection groundwater investigation event(investigation) was proposed with the goal <br /> of refining the locations for the proposed injection activities in the vicinity of the former source <br /> area. This fee proposal presents the proposed scope of work and estimated budget to complete the <br /> investigation. <br /> Geosyntec has prepared this proposal (professional services as Exhibit 1) as Amendment No. 1 to <br /> existing Work Order No. 4 for the Continuing Contract Agreement for Professional Services between <br /> IRC SWDD and Geosyntec. The remainder of this letter provides a description of the proposed <br /> scope of work, a budget estimate, and a discussion of the schedule for accomplishment of the work <br /> described herein. <br /> XR16028 <br /> engineers I scientists I innovators <br />