Laserfiche WebLink
INDIAN RIVER COUNTY, FLORIDA <br />MEMORANDUM 16 ki-1 <br />TO: Joseph A. Baird, County Administrator <br />1 <br />THROUGH: Christopher R. Mora, P.E., Public Works Director <br />Richard B. Szpyrka, P.E., Assistant Public Works Directo <br />James W. Ennis, P.E., PMP, County Engineer_+ <br />FROM: Michael D. Nixon, P.E., Roadway Production Manager 0/l/ <br />SUBJECT: PUBLIC HEARING and CONFIRMING RESOLUTION for 2nd Street Petition Millings <br />Project (35th Avenue to 32nd Avenue) <br />DATE: May 24, 2016 <br />DESCRIPTION AND CONDITIONS <br />Representatives in the Emerson Park Subdivision presented County staff with a petition to <br />install asphalt millings on a portion of 2nd Street. This portion of 2nd Street is a dirt road that <br />begins at 35th Avenue and terminates at 32nd Avenue. <br />The development has 20 parcels. Since the original petition was done, one petitioner sold their <br />property and the new owner has not agreed to the petition. Therefore, the property owners in <br />favor of the project has been reduced from 78.34% to 68.34%. The project still meets the <br />66.7% approval requirement as specified in the Indian River County Code for petition paving <br />(millings). <br />On May 3, 2016 the Board of County Commissioners adopted Resolution No. 2016-04' <br />providing for certain paving (millings) to 2nd Street Petition Millings Project (35th Avenue to 32nd <br />Avenue) within the Emerson Park Subdivision. Also on May 3, 2016 the Board of County <br />Commissioners adopted Resolution No. 2016-042 setting the date and time for a Public Hearing <br />to discuss the process to be taken, costs, and amount of the assessment against each property <br />owner. The Public Hearing is scheduled for June 7, 2016. <br />The proposed improvements to 2nd Street will consist of the installation of 8 -inch thick <br />compacted asphalt millings over 9 -inches of stabilized sub -grade. The roadway limits will be <br />from 35th Avenue to 32"d Avenue, approximately 900 feet. <br />Staff conducted one public informational meeting with the petitioners on February 3, 2016 to <br />discuss the project scope and assessment process. At the residents' request the millings will be <br />placed in the same general area as the existing dirt roadway and no roadway widening, <br />shoulder work, or drainage improvements will be included as part of the project. Staff has <br />determined that the assessment cost based on parcel area (square footage) rather than front <br />footage is fair and appropriate in this case. The property owners consented to moving the <br />project forward with this construction approach, with the assessment cost based on square <br />footage, and the method of payment. <br />77 <br />P-1Public Works\ENGINEERING DIVISION PROJECTS\I525-2nd St hlillings_32nd Ave to 35th Ave\Admin\agenda items\1525 2 St. Pet. Millings - BCC -Pub. Hearing and Confirming <br />Res. 6-7-16.doc <br />