My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
06/14/2016
CBCC
>
Meetings
>
2010's
>
2016
>
06/14/2016
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/7/2020 1:18:39 PM
Creation date
9/29/2016 10:56:13 AM
Metadata
Fields
Template:
Meetings
Meeting Type
BCC Regular Meeting
Document Type
Agenda Packet
Meeting Date
06/14/2016
Meeting Body
Board of County Commissioners
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
224
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SAMPLE AGREEMENT <br />2016040 - Cart Path Repairs <br />D. CONTRACTOR has'obtained and carefully studied (or assumes responsibility for having done so) all <br />additional or supplementary examinations, investigations, explorations, tests, studies, and data <br />concerning conditions (surface, subsurface, and Underground Facilities) at or contiguous to the <br />Site which may affect cost, progress, or performance of the Work or which relate to any aspect of <br />the means, methods, techniques, sequences, and procedures of construction to be employed by <br />CONTRACTOR, including applying the specific means, methods, techniques, sequences, and <br />procedures of construction, if any, expressly required by the Contract Documents to be employed <br />by CONTRACTOR, and safety precautions and programs incident thereto. <br />E. CONTRACTOR does not consider that any further examinations, investigations, explorations, tests, <br />studies, or data are necessary for the performance of the Work at the Contract Price, within the <br />Contract Times, and in accordance with the other terms and conditions of the Contract <br />Documents. <br />F. CONTRACTOR is aware of the general nature of work to be performed by OWNER and others at <br />the Site that relates to the Work as indicated in the Contract Documents. <br />G. CONTRACTOR has correlated the information known to CONTRACTOR, information and <br />observations obtained from visits to the Site, reports and drawings identified in the Contract <br />Documents, and all additional examinations, investigations, explorations, tests, studies, and data <br />with the Contract Documents. <br />H. CONTRACTOR has given OWNER written notice of all conflicts, errors, ambiguities, or discrepancies <br />that CONTRACTOR has discovered in the Contract Documents, and the written resolution thereof <br />by OWNER is acceptable to CONTRACTOR. <br />I. The Contract Documents are generally sufficient to indicate and convey understanding of all terms <br />and conditions for performance and furnishing of the Work. <br />ARTICLES -CONTRACT DOCUMENTS <br />8.01 Contents <br />A. The Contract Documents consist of the following: <br />1. This Agreement (pages 1 to 7 inclusive); <br />2. Notice to Proceed <br />3. Certificate of Liability Insurance <br />4. Addenda (numbers —to---, inclusive); <br />5. CONTRACTOR'S Bid Form (pages _to _ of __, inclusive); <br />6. Bid Bond (pages _ inclusive); <br />7. Affidavit of Compliance (page _ of _); <br />Page 25 of 31 <br />14 <br />
The URL can be used to link to this page
Your browser does not support the video tag.