My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
06/14/2016
CBCC
>
Meetings
>
2010's
>
2016
>
06/14/2016
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/7/2020 1:18:39 PM
Creation date
9/29/2016 10:56:13 AM
Metadata
Fields
Template:
Meetings
Meeting Type
BCC Regular Meeting
Document Type
Agenda Packet
Meeting Date
06/14/2016
Meeting Body
Board of County Commissioners
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
224
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SECTION 00948 - Work Change Directive <br />DATE OF ISSUANCE: 11/19/15 <br />OWNER: Indian River County <br />CONTRACTOR: Dickerson Florida Inc. <br />Project: Vero Lake Estates Asphalt Millings Project (Phase II) <br />Project No.: 1317 <br />Bid No. 2015039 <br />No. 02 <br />EFFECTIVE DATE: 11/19/15 <br />You are directed to proceed promptly with the following changes: <br />Description: <br />Install 120 If of 12° ACMP on the north side of 85th Street from Station 46+83 to 48+03. <br />Install 120 If of 12° ACMP on the south side of 85th Street from Station 54+75 to 55+95. <br />Purpose of Work Change Directive: <br />Inspection of the existing conditions shows that the slopes of the existing Swale will not <br />meet a 4:1 slope in this area due to the depth of the existing Swale <br />Attachments: Dickerson Florida Cost Estimate, Revised Plans with Culvert Locations <br />If OWNER or CONTRACTOR believe that the above change has affected Contract Price any <br />Claim for a Change Order based thereon will involve one or more of the following methods as <br />defined in the Contract Documents. <br />Method of determining change in <br />Contract Prices <br />X Unit Prices <br />[] Lump Sum <br />0 Other. <br />❑ By Change Order. <br />Method of determining change in <br />Contract Times <br />❑ Contractor's Records <br />❑ Engineer's Records <br />❑ Other: <br />II By Change Order. <br />Estimated increase (decrease) of this Work Estimated increase (decrease) in Contract Times: <br />Change Directive <br />$6.000 Substantial Completion: 0 days; <br />Ready for Final Completion: 0 days. <br />If the change involves an increase, the estimated If the change involves an increase, the estimated <br />amount is not to be exceeded without further time is not to be exceeded without further <br />authorization. authorization. <br />ACCEPTED: , I I RECOMMENDED: I 1 APPROVED: <br />CO <br />Date: /a, a?, 16— <br />By:&dy' <br />ENGINEER (Sig <br />Date: /1/ 171(5---- <br />* <br />Y1( <br />* * END OF SECTION * * <br />By: 141A0# <br />OWNER (Signature) <br />Date: <br />FAPub11c Works%ENGINEERING DIVISION PROJECTS\1317-85th St Milling_91st Ave to 101st Ave\Design\Work Change <br />Din:divesWO #2\1317 - WCD #2 to Dickerson 111915.doc 37 <br />
The URL can be used to link to this page
Your browser does not support the video tag.