Laserfiche WebLink
Wonderware Conversion <br />May 26, 2016 Trihedral Q10565-000-000 <br />2 Scope Definition <br />1> Creation of document that outlines existing architecture and defines proposed VTScada architecture <br />moving forward This document would act as a guide as to how the County wishes to design a single <br />VTScada application using realmed filtering and would outline best practices (tag and area architecture, <br />security, etc) in doing so This document would aid the County in each -phase moving forward, regardless <br />of whether the implementation is done in house by the County, by Trihedral or by a Systems Integrator of <br />the County's choosing <br />2> Design and implementation of single County wide VTScada realmed application: Trihedral will create <br />a VTScada application that can be run in parallel with the existing Wonderware application. This "shell" <br />application would allow the County to then bring in each plant one by one until all plants are phased over <br />to VTScada. In addition Trihedral will convert the existing Wonderware tag databases from each plant <br />into standard VTScada tags <br />Currently, Indian River County Utilities has 5 plant running various versions of Wonderware HMI. In <br />addition, the County has roughly 400 Data Flow RTUs running through a Hypserver system using DFS <br />HyperTach 3 software, the lift station system is not part of this scope. <br />2.1 Trihedral Responsibilities <br />For the pricing provided, it is assumed that Trihedral will perform the following services as part of the <br />project: <br />1 Design, coding, and testing of all supplied components <br />2. Attend regularly scheduled meetings with Indian River County Utilities to review the project status <br />3 Provision of all deliverables as detailed in section 3 Deliverables <br />2.2 Indian River County Utilities Responsibilities <br />For the pricing provided, it is assumed that IRCU will perform the following services as part of the project: <br />1. Perform all customer side testing <br />2. Review and validate tag conversion data <br />3 Provide access to test environment <br />4. Provide a means to remotely access (via VPN or similar technology) IRCU assets required for <br />testing and installation <br />5. Provide training for the system end users <br />6. Update all internal documentation <br />7. Provide Trihedral with all plant Wonderware tag databases in CSV format. <br />2.3 Assumptions & Clarifications <br />The following items are not included in the scope of the project or the price provided by Trihedral: <br />1. No installations of any computers or other hardware. <br />2. Reprogramming of control equipment <br />3. Voice modems to be supplied by IRCU <br />4. It is assumed that some data in the existing Wonderware tag database may be incorrect or <br />invalid It will be the responsibility of IRCU to verify and correct. <br />2 <br />56 <br />