Laserfiche WebLink
SECTION 00948 - Work Change Directive <br />No. 1 <br />DATE OF ISSUANCE: 8-7-15 EFFECTIVE DATE: 8-7-15 <br />OWNER: Indian River County <br />CONTRACTOR: Guettler Brothers Construction LLC <br />Project: Aviation Boulevard/20"' Avenue Intersection Improvements <br />OWNER's Project No. 1422 <br />You are directed to proceed promptly with the following changes: <br />Description: <br />To provide one Variable Message Sign (VMS) and one informational sign on US1 for south <br />bound traffic informing motorist that the Aviation Boulevard / 20 Avenue bridge will be <br />closed. <br />Purpose of Work Change Directive: <br />Provide advanced notice to motorist of bridge closure. <br />Attachments: (List documents supporting change) <br />Proposal from Guettler Brothers Construction LLC, dated 8/7/15 with quote from Bob's <br />Barricades, Inc., dated 8/5/15 <br />If OWNER or CONTRACTOR believe that the above change has affected Contract Price any <br />Claim for a Change Order based thereon will involve one or more of the following methods as <br />defined in the Contract Documents. <br />Method of determining change in <br />Contract Prices <br />[K Unit Prices <br />Lump Sum <br />❑ Other. <br />❑ By Change Order. <br />Method of determining change in <br />Contract Times <br />Q Contractor's Records <br />Q Engineer's Records <br />II Other. <br />II By Change Order. <br />VMS $65.00 per day x 10 days = $650.00 <br />Special Sign <br />'IRC ADMIN BRIDGE CLOSED' Lump Sum = $250.00 <br />Subtotal = $900.00 <br />15% Markup = $135.00 Estimated increase (decrease) in Contract <br />TOTAL = li,035M Times: NONE <br />Estimated increase of this Work Change Directive <br />$1,035.00 <br />If the change involves an increase, the estimated <br />amount is not to be exceeded without further <br />authorization. <br />Substantial Completion: 0 days; <br />Ready for Final Completion: 0 days. <br />If the change involves an increase, the estimated <br />time is not to be exceeded without further <br />authorization. <br />ACCEPTED: <br />RECOMMENDED: <br />APPROVED: <br />By. <br />B . i <br />Blr <br />y' <br />EN (NEER ( ig ature) <br />!/ <br />C TRACTOR (Signature) <br />OWN R ( ignature) <br />Date: E3-11 -L5 <br />Date: 8 -11 - i 5 <br />Date: g �(I s <br />F:Tubfic Works\ENGINEERING DIVISION PROJECTS11422 Aviation 13hrd-20th Avenue Intersection ImprovementsWdmimMork <br />Change Dir100948 - Work Change Directive No. 1.doc <br />107 <br />