My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
06/21/2016 (4)
CBCC
>
Meetings
>
2010's
>
2016
>
06/21/2016 (4)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/7/2020 1:27:11 PM
Creation date
9/29/2016 11:15:16 AM
Metadata
Fields
Template:
Meetings
Meeting Type
BCC Regular Meeting
Document Type
Agenda Packet
Meeting Date
06/21/2016
Meeting Body
Board of County Commissioners
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
366
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SECTION 00948 - Work Change Directive <br />DATE OF ISSUANCE: 4-28-16 <br />No. 5 <br />EFFECTIVE DATE: 4-28-16 <br />OWNER: Indian River County <br />CONTRACTOR: Guettler Brothers Construction LLC <br />Project: Aviation BoulevardQ01' Avenue Intersection improvements <br />OWNER's Project No. jM <br />You are directed to proosed promptly with the following changes: <br />Description: <br />To revise the guardrail End Anchor Assembly from Type CRT to Type II <br />Purpose of Work Change Directive: <br />The end anchor assembly Is outside of any dear zone and it was determined that a Type <br />CRT End Anchor Assembly was not necessary. The Type II End Anchor Assembly Is <br />appropriate. <br />Attachments: (Ust documents supporting change) <br />E-mail from Guettler Brothers Constriction LLC, dated February 17, 2016. <br />If OWNER or CONTRACTOR believe that the above change has affected Contract Price any <br />Claim for a Change Order based thereon will involve one or more of the following methods as <br />defined In the Contract Documents. <br />Method of detemnlning change In <br />Contract Prices <br />NONE <br />Unft Prices <br />Lump Sten <br />Other: <br />By Change Order. <br />Method of determining grange In <br />Contract Thnes <br />Contractor's Records <br />Englneees Records <br />Other._Thme extension request by Contractor <br />By Change Order. <br />NO CHANGE IPI CONTRACT TIME <br />ACCEPTED: <br />RECOMMENDED: <br />APPROVED: <br />By: <br />BY io� ne-�1 <br />By- <br />YCONTRACTOR <br />CONTRACTOR(Signature) <br />ENGINEER (Stgnature) <br />OWNER (Sig m) <br />Date: 5 4 i tQ <br />Date: S G <br />Date: i l <br />t <br />F1 Aft IAlm iV*XR p Dr4M= PRoj5CM421 AMbq ak,4.2M Am= ktrSocUan ftMM0Mw4&AMWAbrk C?dpo MUM • Nb* OwW Mr**s <br />N0. &coo <br />119 <br />
The URL can be used to link to this page
Your browser does not support the video tag.