My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
06/21/2016 (4)
CBCC
>
Meetings
>
2010's
>
2016
>
06/21/2016 (4)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/7/2020 1:27:11 PM
Creation date
9/29/2016 11:15:16 AM
Metadata
Fields
Template:
Meetings
Meeting Type
BCC Regular Meeting
Document Type
Agenda Packet
Meeting Date
06/21/2016
Meeting Body
Board of County Commissioners
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
366
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
STATE OF FLORIDA DEPARTMENT OF TRANSPORTATION 525-010-40 <br />LOCAL AGENCY PROGRAM AGREEMENT PROGRAM MANAGEMENT <br />occ-OSMS <br />Pape 1 <br />EXHIBIT "A" <br />PROJECT DESCRIPTION AND RESPONSIBILITIES <br />F P N: 431733-1-58/68-01 <br />This exhibit forms an integral part of the Local Agency Program Agreement between the State of Florida, Department of <br />Transportation and <br />Indian River Countv <br />PROJECT LOCATION: <br />❑ The project is on the National Highway System. <br />❑ The project is on the State Highway System. <br />PROJECT LENGTH AND MILE POST LIMITS: 2.449 Miles <br />- ---- .PROJECT DESCRIPTION: 8w St =Sidewalk Improvements from.58� Ave. to 21st Ct. <br />SPECIAL CONSIDERATIONS BY AGENCY: <br />The audit report(s) required in the Agreement shall include a Schedule of Project Assistance that will reflect the <br />,were <br />applicable, the amount of state funding action (receipt and disbursement of funds), any federal or local funding action, and <br />-- the funding action -from any-otherso-urce-with-respect-to the proiecU- <br />The Agency is required to provide a copy of the design plans for the Department's review and approval to coordinate <br />permitting with the Department, and notify the Department prior to commencement of any right-of-way activities. <br />The Agency shall commence the project's activities subsequent to the execution of this Agreement and shall perform in <br />accordance with the following schedule: <br />a) Study to be completed by N/A . <br />b) Design to be completed by WA <br />c) Right -of -Way requirements identified and provided to the Department by N/A <br />d) Right -of -Way to be certified prior to advertising for construction (All Phase 58 LAPS) <br />e) Construction contract to be let by 11/04/2016 <br />. <br />f) Construction to be completed by 6/30/2018. <br />If this schedule cannot be met, the Agency will notify the Department in writing with a revised schedule or the project is <br />subject to the withdrawal of federal funding. <br />SPECIAL CONSIDERATIONS BY DEPARTMENT: N/A <br />48 <br />
The URL can be used to link to this page
Your browser does not support the video tag.