Laserfiche WebLink
PAY APPLICATION 06 - FINAL PAYMENT, 08110116 IRC PROJECT NO. 1422 AVIATION OLVD120TH AVENUE INTERSECTION IMPROVEMENTS <br />r n�neam ae. aarN�rrar elvw.r awrn ae r • aaraH rwar..w„ r,.. on arra r rma... <br />SCHEDULED VALUE <br />PREVIOUS APPLICATION <br />TH47 PERIOD <br />TOTAL COMPLETED <br />% <br />MATERIALS <br />BALANCE TO FINISH <br />'ry w.;T; :•1iN i * n•:ard�•: . ^ :' = /'A 11 �Yf - <br />it wdtmp 7+5 1L: 1G' - - ^.'i.' <br />" l L'"."11 1 ^•, <br />n, . __ 1111':11 <br />SIC"0.' -,W4C <br />77T <br />11r <br />.:t <br />,1.p�7 f..'1 •>L <br />30,000.00 <br />0.00 <br />1.00 <br />30,000.00 <br />100% <br />0.00 <br />0.00 <br />0.00 <br />101-1 <br />MOBILIZATION <br />1 <br />LS <br />30 000.00 <br />1.00 <br />30 000.00 <br />24.000'00 <br />0.00 <br />1.00 <br />24,000.00 <br />100% <br />0.00 <br />0.00 <br />0.00 <br />102-1 <br />MAINTENANCE OF TRAFFIC <br />1 <br />LS <br />21 000.00 <br />1.00 <br />21 000.00 <br />PREVENTION, CONTROL & ABATEMENT OF EROSION <br />2,500.00 <br />0.00 <br />1.00 <br />2,500.00 <br />100% <br />0.00 <br />0.00 <br />0.00 <br />104-1 <br />AND WATER POLLUTION <br />1 <br />LS <br />2,500.00 <br />1.00 <br />2,500.001 <br />108.1 <br />RECORDIASBUILT DRAWINGS <br />1 <br />LS <br />8.000.00 <br />6,000.00 <br />1.00 <br />6000.00 <br />0.00 <br />1.00 <br />8,000.00 <br />100% <br />0.00 <br />0.00 <br />0.00 <br />110.1.1 <br />CLEARING & GRUBBING <br />16 1 <br />AC <br />9,300.00 <br />11,880.00 <br />1.80 <br />14 880.00 <br />0.00 <br />1.80 <br />14,880.00 <br />100% <br />0.00 <br />0.00 <br />0.00 <br />19.00 <br />0.00 <br />669.00 <br />12,711.00 <br />100% <br />0.00 <br />0.00 <br />0.00 <br />120.1 <br />REGULAR EXCAVATION <br />889 <br />CY <br />12,711.00 <br />689.00 <br />12 711.00 <br />18.00 <br />0.00 <br />881.00 <br />15,198.00 <br />100% <br />0.00 <br />0.00 <br />0.00 <br />120.6 <br />EMBANKMENT COMPACTED IN PLACE) <br />861 <br />CY <br />15 498.00 <br />861.00 <br />15 498.00 <br />285.714 <br />CEMENTED COOUINA SHELL BASE 11 3 LIFTS <br />2,260 <br />BY <br />21'00 <br />47,460.00 <br />2.358.00 <br />49 478.00 <br />0.00 <br />2,356.00 <br />49,476.00 <br />104% <br />0.00 <br />-98.00 <br />-2,016.00 <br />MILLING EXISTING ASPHALT PAVEMENT (1' AVG. <br />300 <br />0.00 <br />3,484.00 <br />10,452.00 <br />100% <br />0.00 <br />0.00 <br />0.00 <br />327.70.1 <br />DEPTH <br />3,484 <br />BY <br />10,452.00 <br />3,484.00 <br />10 452.00 <br />TYPE SPA 2.5 STRUCTURAL COURSE (TRAFFIC C) (FINE <br />135.00 <br />0.00 <br />189.00 <br />25,515.00 <br />112% <br />0.00 <br />-20.00 <br />-2,700.00 <br />334.1.13 <br />MIX 1.5 <br />169 <br />TN <br />22 815.00 <br />189.00 <br />25 515.00 <br />TYPE SP -9.5 STRUCTURAL COURSE (TRAFFIC C) (FINE <br />122.00 <br />0,00 <br />318.80 <br />38,819.80 <br />101% <br />0.00 <br />-12.80 <br />-1,581.80 <br />334.1.13A <br />MIX 1 <br />304 <br />TN <br />37,088.00 <br />316.80 <br />30 649.60 <br />339.1 <br />MISCELLANEOUS ASPHALT 2 <br />4 <br />TN <br />830.00 <br />3,320.00 <br />0.00 <br />0.00 <br />0.00 <br />0.00 <br />0.00 <br />0% <br />0.00 <br />4.00 <br />3,320.00 <br />425.1.351 <br />INLETS CURB E PS <10 <br />2 <br />EA <br />3.200.00 <br />6,100.00 <br />2.00 <br />6,400.0 <br />0.00 <br />2.00 <br />8,400.00 <br />100% <br />0.00 <br />0.00 <br />0.00 <br />425.1-521 <br />INLETS ITCH BOTTOM PEC <10 <br />1 <br />EA <br />2,900.00 <br />2,900.00 <br />1.00 <br />2,900.001 <br />0.00 <br />1.00 <br />2,900.00 <br />100% <br />0.00 <br />0.00 <br />0.00 <br />425.1.549 <br />MODIFY STRUCTURE MANHOLE <br />I <br />EA <br />2,100.00 <br />2,100.00 <br />1.00 <br />2,100.00 <br />0.00 <br />1.00 <br />2,100.00 <br />100% <br />0.00 <br />0.00 <br />0.00 <br />• <br />3.500.00 <br />0.00 <br />1.00 <br />3,500.00 <br />100% <br />0.00 <br />0.00 <br />0.00 <br />425.2.41 <br />MANHOLE P-7 <10 <br />I <br />EA <br />3,500.00 <br />1.00 <br />3,500.0 <br />425.5.1 <br />MANHOLE ADJUST(UTILITIES) <br />1 <br />EA <br />1'100'00 <br />1,100.00 <br />1.00 <br />1100.00 <br />0.00 <br />1,00 <br />1,100.00 <br />100% <br />0.00 <br />0.00 <br />0.00 <br />430.174-115 <br />CONCRETE PIPE CULVERT IS -SD <br />58 <br />LF <br />33.00 <br />1,914.00 <br />58.00 <br />1911,00 <br />0.00 <br />58.00 <br />1,914.00 <br />100% <br />0.00 <br />0.00 <br />0.00 <br />430.174.215 <br />ELLIPTICAL PIPE CULVERT ERCP 12' X18' SD <br />100 <br />LF <br />49.00 <br />4,900.00 <br />100.00 <br />4,900.0 <br />0.00 <br />100.00 <br />4,900.00 <br />100% <br />0.00 <br />0.00 <br />0.00 <br />430-174.218 <br />ELLIPTICAL PIPE CULVERT ERCP 14' X23' SD <br />130 <br />LF <br />51.00 <br />8,830.00 <br />87.00 <br />4,437.00 <br />0.00 <br />87,00 <br />4,437.00 <br />67% <br />0.00 <br />43.00 <br />2,193.00 <br />430174424 <br />ELLIPTICAL PIPE CULVERT, ERCP 19- X30• SD <br />1e1 <br />LF <br />S4'00 <br />8,694.00 <br />170.00 <br />9,100.00 <br />0.00 <br />170.00 <br />9.180.00 <br />106% <br />0.00 <br />-9.00 <br />-486.00 <br />430904.625 <br />MITERED END SECTION CONCRETE 14'X23' SD <br />1 <br />EA <br />1,070.00 <br />1,070.00 <br />1.00 <br />1.07000 <br />0.00 <br />1.00 <br />1,070.00 <br />100% <br />0.00 <br />0.00 <br />0.00 <br />430-984-629 <br />MITERED END SECTION CONCRETE 19'X30' SD <br />I <br />EA <br />1,300.00 <br />1.300.00 <br />1.00 <br />1,300.0 <br />0.00 <br />1.00 <br />1,300.00 <br />100% <br />0.00 <br />0.00 <br />0.00 <br />5201.10 <br />CONCRETE CURB 6 GUTTER E <br />398 <br />LF <br />10'40 <br />6,521.20 <br />377.00 <br />6,182.80 <br />0.00 <br />377.00 <br />6,182.80 <br />95% <br />0.00 <br />21.00 <br />311.40 <br />522.2 <br />CONCRETE SIDEWALK AND DRIVEWAYS 8- THICK <br />57 <br />BY <br />56.00 <br />3,306.00 <br />71.00 <br />4,118.00 <br />0.00 <br />71.00 <br />4,118.00 <br />125% <br />0.00 <br />-14.00 <br />-812.00 <br />5301.1 <br />GUARDRAIL(ROADWAY) <br />50 <br />LF <br />18'85 <br />812.50 <br />50.00 <br />842.50 <br />0.00 <br />50.00 <br />842.50 <br />100% <br />0.00 <br />0.00 <br />0.00 <br />536.8 <br />GUARDRAIL BRIDGE ANCHORAGE ASSEMBLY <br />2 <br />EA <br />2'700.00 <br />5,400.00 <br />2.00 <br />5.400.001 <br />0.00 <br />2.00 <br />5,400.00 <br />100% <br />0.00 <br />0.00 <br />0.00 <br />536.85.26 <br />GUARDRAIL END ANCHORAGE ASSEMBLY E CRn <br />2 <br />EA <br />2,500.E <br />S 000.00 <br />0.00 <br />0.00 <br />0.00 <br />0.00 <br />0.00 <br />0% <br />0.00 <br />2.00 <br />5,000.00 <br />2.00 <br />1 0,00 <br />6,340.00 <br />12,880.00 <br />100% <br />0.00 <br />0.00 <br />0.00 <br />5701.2 <br />PERFORMANCE TURF SOD BAHIA <br />6,340 <br />SY <br />12,680.00 <br />6,340.00 <br />12 680.00 <br />r n�neam ae. aarN�rrar elvw.r awrn ae r • aaraH rwar..w„ r,.. on arra r rma... <br />