Laserfiche WebLink
WORK ORDER NUMBER 7 <br />66th Avenue Roadway Widening - 49th Street to 81St Street <br />IRC Project No. 1505 <br />This Work Order Number 7 is entered into as of this —day of _ 2016, pursuant to <br />that certain Continuing Contract Agreement for Professional Services, dated November 15, 2011 and that <br />certain Extension and Amendment of Continuing Contract Agreement for Professional Services entered into <br />as of the 4th day of November, 2014 (collectively referred to as the "Agreement'), by and between INDIAN <br />RIVER COUNTY, a political subdivision of the State of Florida ("COUNTY") and Kimley-Horn & <br />Associates, Inc.("Consultant"). <br />EXHIBIT A <br />SCOPE OF WORK <br />The COUNTY desires to complete the design, construction document development and permitting associated <br />with the widening of 66th Avenue to a four lane divided corridor as previously approved by the COUNTY <br />through the adoption by the COUNTY Commission of the 66th Avenue/ Schumann Drive Corridor Study, <br />presented in 2010. Consultant services are required for the preparation of design surveys, roadway <br />construction documents and review agency permits necessary to support widening 66th Avenue between <br />491h Street to 81St Street, with associated side street improvements. The COUNTY desires to develop the <br />improvements within two independent construction phases, the remaining portion of Phase I being between <br />49th Street to 57th Street and Phase II being between 57th Street to 81s' Street. <br />A. Proiect Management/ Coordination: <br />66th Avenue Phase I Improvements has been divided between two separate consulting firms, the COUNTY <br />has requested that the two firms coordinate to represent a single set of coordinated construction <br />documents. Based upon a meeting with COUNTY staff, the other consulting firm and Kimley-Horn; <br />Kimley-Horn has agreed to serve as the project coordinator responsible for delivering the coordinated <br />construction plans to the COUNTY. <br />B. Roadway Analysis and Plans Revisions: <br />The Consultant will revise the Phase I and Phase II construction documents, quantities, etc. to reflect <br />the corridor transition between Phase I and Phase II improvements, in addition the Phase II construction <br />documents will be revised to reflect the transition from a four lane divided corridor to the existing two <br />lane corridor north of 811t Street. <br />C. Utility Coordination: <br />The Consultant will coordinate with franchise utility operators in the vicinity of the project such that the <br />proposed construction activities can be developed to minimize impacts to existing utilities located within <br />the project limits. Any utility permitting and relocation design required to accommodate the proposed <br />improvements will be addressed as an additional service relative to this scope of work. <br />D. Legal Description and Sketch Revisions: <br />The Consultant will update/ revise the previously submitted 66" Avenue and associated side street legal <br />description and sketches, based upon requests by the COUNTY as a result of coordination with the <br />respective property owners. <br />59 <br />