Laserfiche WebLink
Mot <br /> �� <br /> ®� Mr. Vincent Burke <br /> June 29, 2016 <br /> Page 2 of 5 <br /> Project Number: 16-0244 <br /> 6. Operator certifications <br /> 7. Facility maintenance program <br /> 8. Facility records <br /> 9. Sampling procedures <br /> 10. Laboratory analysis procedures <br /> Task 2—Tabulation and Analysis of Plant Operating Data <br /> MBV Engineering, Inc. will tabulate and analyze, as required by FDEP, historical plant operating <br /> data, which documents plant operating conditions for the duration of the current operating permit. <br /> Plant operating data will be provided by Indian River County Utilities (IRCU)staff as specified in <br /> the "Information Provided by Owner'' section found within this Scope of Services. <br /> Task 3—Preparation and Submittal of FDEP Permit Renewal <br /> MBV Engineering, Inc will prepare and provide to IRCU, the following applications and forms <br /> necessary to obtain the facility's required operating permit. After IRCU approval MBV <br /> Engincering, Inc will then provide the applications and forms to FDEP. <br /> 1. FDEP Wastewater Facility or Activity Permit Form I - DEP Form 62-620.910(1) <br /> 2. FDEP Wastewater Facility or Activity Permit Form 2A - DEP Form 62-620.910(2) <br /> 3. Application to renew shall include updated Capacity Analysis Report (62-600.405) <br /> 4. Application to renew shall include detailed Operation and Maintenance Report <br /> (62-600.735) <br /> Task 4—Preparation of FDEP Required Backup Documentation <br /> MBV Engineering, Inc. will provide to FDEP and IRCU the following backup documents, maps, <br /> and diagrams that'are necessary to obtain the facility's required operating permit. <br /> 1. Process Flow Diagram <br /> 2. Site Plan <br /> 3. Location and Vicinity Maps <br /> 4. Facilities Description <br /> Task 5—Attendance at FDEP Meeting/Sitc Inspection Necessary to Close-out New Permit <br /> MBV Engineering, Inc will attend the final walk through meeting/inspection that is normally <br /> necessary in order to finalize the permitting process. This on-site meeting is usually attended by <br /> -both FDEP and county personnel as well as a representative of the engineering firm in order to <br /> discuss the details of the W WTF and what, if any, plant issues need to be addressed. <br /> 74 <br />