My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
07/12/2016 (5)
CBCC
>
Meetings
>
2010's
>
2016
>
07/12/2016 (5)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/29/2016 11:50:50 AM
Creation date
9/29/2016 11:50:07 AM
Metadata
Fields
Template:
Meetings
Meeting Type
BCC Regular Meeting
Document Type
Agenda Packet
Meeting Date
07/12/2016
Meeting Body
Board of County Commissioners
Subject
Fellsmere Roads
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
424
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
The Contractor is responsible for obtaining all necessary permits. County has obtained the <br /> necessary Florida Department of Environmental Protection Potable Water System Component <br /> Construction Permit. <br /> ARTICLE 2 - THE PROJECT <br /> 2.01 The Project for which the Work under the Contract Documents may be generally described <br /> as follows: <br /> Project Name: South County Water Treatment Plant Well No. 7 Raw Water Pipeline <br /> Bid Number: 2016032 <br /> Project Address: South County Park, 201 Avenue and Oslo Road. <br /> ARTICLE 3 —TERM AND CONTRACT TIMES <br /> 3.01 The CONTRACTOR shall be substantially completed with the following timeframe <br /> (a) Within 60 calendar days from effective date of Notice to Proceed, Contractor shall <br /> complete the following tasks: <br /> 1. Obtain all necessary permits. <br /> 2. Receive approved shop drawings for all materials and equipment to be <br /> utilized in the job. <br /> 3. Perform all photographic recording and documentation of conditions prior <br /> to construction. <br /> 4. Locate all existing utilities in the area of work. <br /> 5. Mobilize all labor, equipment, and materials. <br /> 6. Deliver and store all equipment and materials to the job site. <br /> 8. Notify all utilities and other affected parties prior to initiating construction. <br /> 9. Construct the water main, including the portion to be installed via horizontal <br /> directional drill. <br /> (b) Completion of all tasks outlined above (i.e., Subparagraphs a) and b) constitutes <br /> Substantial Completion. <br /> (c) From 60 calendar days to 90 calendar days from the effective date of Notice to <br /> Proceed, the CONTRACTOR shall complete the following tasks: <br /> 1. Clean up project area. <br /> 2. Remove all equipment and material from project site. <br /> 3. Perform contract closeout procedures. <br /> 3.02 Completion of all tasks outlined above (i.e., Subparagraphs a, b, and c) constitute <br /> Final Completion. <br /> 3.03 Liquidated Damages <br /> CONTRACTOR and OWNER recognize that time is of the essence of this Agreement and <br /> that OWNER will suffer financial loss if the Work is not completed within the times specified <br /> in paragraph-3.01 above, plus any extensions thereof allowed in writing as a change order <br /> Section 00530-2 <br /> 85 <br />
The URL can be used to link to this page
Your browser does not support the video tag.