My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2016-160
CBCC
>
Official Documents
>
2010's
>
2016
>
2016-160
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/11/2016 1:13:49 PM
Creation date
10/11/2016 1:13:48 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Agreement
Approved Date
10/04/2016
Control Number
2016-160
Agenda Item Number
8.M.
Entity Name
Carter Associates
Subject
Professional Surveying and Mapping Services
Project Number
1605
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
13
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
I <br /> requirements are made into law and established by regulatory agencies <br /> after the effective date of the Work Order. <br /> D. The COUNTY shall make all provisions for the SURVEYOR to enter upon <br /> public or private property subsequent to initial provisions performed by the <br /> SURVEYOR and as reasonably required for the SURVEYOR to perform <br /> his services. <br /> E. The COUNTY shall provide all title information and title opinion relating to <br /> land acquisition as applicable. <br /> F. The COUNTY shall provide property appraisal information for areas of <br /> potential acquisition as applicable. <br /> G. The COUNTY shall supply the SURVEYOR with copies of all applicable <br /> local codes and regulations. <br /> SECTION III — SCOPE OF SERVICES <br /> The SURVEYOR agrees to perform all necessary professional surveying and <br /> mapping services and other pertinent services in connection with the assigned project <br /> as required and as set forth in the following: <br /> 1. The SURVEYOR will endeavor not to duplicate any previous work <br /> done on any project. Before issuance of a Work Order and written <br /> authorization to proceed, the SURVEYOR shall consult with the <br /> COUNTY to clarify and define the COUNTY's requirements for the <br /> project and review all available data. <br /> 2. The SURVEYOR shall attend conferences with the COUNTY and <br /> its representatives, upon request. <br /> 3. In order to accomplish the work described under this Agreement <br /> under the time frames and conditions set forth in this Agreement, <br /> the SURVEYOR shall: <br /> a. Complete work on the project within the time allowed by <br /> maintaining an adequate staff of registered Surveyors and <br /> Mappers, GIS Professionals, Cadd operators, Survey <br /> Technicians and other employees on the work at all times. <br /> b. Comply with all federal, state, and local laws applicable to <br /> this project(s). The SURVEYOR'S work product shall <br /> conform with all applicable federal, state and local laws <br /> applicable to this project(s). <br /> C. The SURVEYOR shall cooperate fully with the COUNTY in <br /> order that all phases of the work may be properly <br /> scheduled and coordinated. <br /> d The SURVEYOR shall contact the Sunshine State One <br /> Call of Florida ("SSOCOF") to locate the utilities, and <br /> SURVEYOR shall be entitled to rely on information <br /> provided by SSOCOF. SURVEYOR shall survey all <br /> above-ground structures, and utilities on the final plans. <br /> e. The SURVEYOR understands that certain County <br /> AutoCAD (Drawing) standards are being adopted; said <br /> standards shall be defined in individual work orders. <br /> f. The SURVEYOR shall report the status of the project to <br /> the County Surveyor upon request and hold all drawings, <br /> electronic files, calculations, and related work open to the <br /> FVublic Works\ENGINEERING OMSION PROJECTS11605 IRC Annual 2016 Professional Survey Services ContractWdmm12016-2018 AgreementsWaster Agreement- <br /> Carter Assocdoc <br /> Page 2 of 9 <br />
The URL can be used to link to this page
Your browser does not support the video tag.