My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2016-163
CBCC
>
Official Documents
>
2010's
>
2016
>
2016-163
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/11/2016 1:21:02 PM
Creation date
10/11/2016 1:21:01 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Agreement
Approved Date
10/04/2016
Control Number
2016-163
Agenda Item Number
8.M.
Entity Name
Southeastern Surveying and Mapping Corp.
Subject
Professional Surveying and Mapping Services
Project Number
1605
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
15
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Page 2 <br /> Subsurface Utility Engineering Services <br /> Designating Services <br /> Project Manager S 130 00/per hour <br /> Senior Technician 597.00/per hour <br /> 2 man crew S210.00/per hour <br /> 3 man crew S243.00/per hour <br /> Vacuum Excavation <br /> Test Holes <br /> 1 Test Hole/Dirt S46300 <br /> 1 Test Hole/Asphalt/Concrete 5575.00 <br /> 2 - 19 Test Holes/Dirt 5396.00/each <br /> 2 - 19 Test Holes/Asphalt/Concrete 5452.00/each <br /> 20-49 Test Holes/dirt 5362.00/each <br /> 20-49 Test Holes/asphalt/concrete $407.00/each <br /> 50-99 Test Holes/dirt 5312.00/each <br /> 50-99 Test Holes/asphalt/concrete 5362.00/each <br /> 100 or more Test Holes/dirt S277.00/each <br /> 100 or more Test Holes/asphalt/concrete 5316.00/each <br /> GPR Bore Route 5564.00/each <br /> Vacuum Excavation for Environmental Services <br /> Vacuum Excavation for Monitoring Wells/Soil Samples when requirements dictate vacuum or hand digging down 8 feet to <br /> 10 feet prior to drilling. (3"-4" in diameter, 8'to 10'deep; concrete/asphalt removed if necessary) <br /> I -9 Monitoring Wells/Soil Samples 5283.00/each <br /> 10- 19 Monitoring Wells/Soil Samples 5227.00/each <br /> 20-49 Monitoring Wells/Soil Samples S 170.00/each <br /> An hourly rate of 5323.00 Nvill be used for all exploratory excavation projects. <br /> Larger excavation projects which require specialized equipment <br /> (shoring;de-Nvatering,etc)will be quoted on a task by task basis. <br /> Utility Coordination Services <br /> Senior Utility Coordinator $130 00/per hour <br /> Utility Coordinator $97 00/per hour <br /> CAD Technician S86 00/per hour <br /> Survey Services for Utility Projects <br /> Project Manager/Professional Surveyor and Mapper S 130 00/per hour <br /> Two Person Survey Field Team S 130.00/per hour <br /> Three Person Survey Field Team S 164 00/per hour <br /> Clerical 558.00/per hour <br /> Concrete Radar Mapping/Imaging <br /> (concrete assessment/inspection;grid scans, density&debris assessment) <br /> I Man Crew 5210.00/per hour <br /> Closed Circuit Televising (CCTV) Services (will be quoted on a task by task basis per requirements) <br /> Maintenance of Traffic (MOT) <br /> If required MOT specialist will be contracted and cost for same will be passed on with a 10% mark-up for coordination of <br /> same <br /> SSMC MOT Lane Closures Per Lane Closure 5594.00/per day <br /> Per Lane Closure $792 00/per night <br />
The URL can be used to link to this page
Your browser does not support the video tag.