Laserfiche WebLink
Page 2 <br /> Subsurface Utility Engineering Services <br /> Designating Services <br /> Project Manager S 130 00/per hour <br /> Senior Technician 597.00/per hour <br /> 2 man crew S210.00/per hour <br /> 3 man crew S243.00/per hour <br /> Vacuum Excavation <br /> Test Holes <br /> 1 Test Hole/Dirt S46300 <br /> 1 Test Hole/Asphalt/Concrete 5575.00 <br /> 2 - 19 Test Holes/Dirt 5396.00/each <br /> 2 - 19 Test Holes/Asphalt/Concrete 5452.00/each <br /> 20-49 Test Holes/dirt 5362.00/each <br /> 20-49 Test Holes/asphalt/concrete $407.00/each <br /> 50-99 Test Holes/dirt 5312.00/each <br /> 50-99 Test Holes/asphalt/concrete 5362.00/each <br /> 100 or more Test Holes/dirt S277.00/each <br /> 100 or more Test Holes/asphalt/concrete 5316.00/each <br /> GPR Bore Route 5564.00/each <br /> Vacuum Excavation for Environmental Services <br /> Vacuum Excavation for Monitoring Wells/Soil Samples when requirements dictate vacuum or hand digging down 8 feet to <br /> 10 feet prior to drilling. (3"-4" in diameter, 8'to 10'deep; concrete/asphalt removed if necessary) <br /> I -9 Monitoring Wells/Soil Samples 5283.00/each <br /> 10- 19 Monitoring Wells/Soil Samples 5227.00/each <br /> 20-49 Monitoring Wells/Soil Samples S 170.00/each <br /> An hourly rate of 5323.00 Nvill be used for all exploratory excavation projects. <br /> Larger excavation projects which require specialized equipment <br /> (shoring;de-Nvatering,etc)will be quoted on a task by task basis. <br /> Utility Coordination Services <br /> Senior Utility Coordinator $130 00/per hour <br /> Utility Coordinator $97 00/per hour <br /> CAD Technician S86 00/per hour <br /> Survey Services for Utility Projects <br /> Project Manager/Professional Surveyor and Mapper S 130 00/per hour <br /> Two Person Survey Field Team S 130.00/per hour <br /> Three Person Survey Field Team S 164 00/per hour <br /> Clerical 558.00/per hour <br /> Concrete Radar Mapping/Imaging <br /> (concrete assessment/inspection;grid scans, density&debris assessment) <br /> I Man Crew 5210.00/per hour <br /> Closed Circuit Televising (CCTV) Services (will be quoted on a task by task basis per requirements) <br /> Maintenance of Traffic (MOT) <br /> If required MOT specialist will be contracted and cost for same will be passed on with a 10% mark-up for coordination of <br /> same <br /> SSMC MOT Lane Closures Per Lane Closure 5594.00/per day <br /> Per Lane Closure $792 00/per night <br />