Laserfiche WebLink
A TRUE COPY <br /> CERTIFICATION ON LAST PACE <br /> MASTELLER & MOLER, INC. J.R. Gt ITH, CLERK <br /> M — CIVIL ENGINEERS -- <br /> 23rd Street SW Roadway Improvements <br /> CERTIFIED PERFORMANCE BOND COST ESTIMATE <br /> Reference: "23rd Street SW Roadway Improvement Plans," Masteller&Moler, Inc., dated December 3, 2015. <br /> Item Descri tion Quantity Unit Unit Price Total <br /> 1 Mobilization 1 LS $ 6,500.00 $ 6,500.00 <br /> 2 Erosion Control 1 LS $ 2,000.00 $ 2,000.00 <br /> 3 Clearing&Grubbing 085 Acre $ 3,25000 $ 2,762.50 <br /> 4 Demolish Existing Asphalt 2,050 SY $ 5.00 $ 10,250.00 <br /> 5 Import Fill 2,500 CY $ 9.00 $ 22,500.00 <br /> 6 Rough Grade 7,200 SY $ 1.00 $ 7,200.00 <br /> 7 Finish Grade 7,200 SY $ 1 35 $ 9,720.00 <br /> 8 Storm Inlet-Type"C" 3 EA_ $ 2,200 00 $ 6,600.00 <br /> 9 Storm Pipe-RCP 18" 300 LF $ 36.00 $ 10,800 00 <br /> 10 Storm Pipe-CAP 18" 190 LF $ 30.00 $ 5,700.00 <br /> 11 Dewatering& Lake Installation of Pipe 1 LS $ 10,000 00 $ 10,000 00 <br /> 12 Sod: Swales&Disturbed Areas 4,200 SY $ 2.25 $ 9,45000 <br /> 13 Asphalt-1 0"SP 9.5 3,105 SY $ 570 $ 17,698.50 <br /> 14 Asphalt-1.5"SP 12.5 3,106 SY $ 855 $ 26,556.30 <br /> 15 8"Rock Base 2,970 SY $ 13.00 $ 38,610.00 <br /> 16 12"Stabilized Subgrade 3,050 SY $ 5.25 $ 16,012.50 <br /> 17 JAdjust Fire Hydrant 2 EA $ 1,50000 $ 3,000.00 <br /> 18Drivewa -6"Concrete 51 SY $ 45.00 $ 2,295.00 <br /> 19 Sidewalk-6"Concrete 638 SY $ 45.00 $ 28,710 00 <br /> 20 Signs/Pavement Markin 1 LS $ 2,654.40 $ 2,65440 <br /> 21 Engineering Design 1 LS $ 8,50000 $ 8,500.00 <br /> 22 Permit Application Fees 1 LS $ 81000 $ 810.00 <br /> 23 Density Testiri 1 LS $ 1,500.00 $ 1,500.00 <br /> 24 Survey Stake-out 1 LS $ 1,800.00 $_ 1,800.00 <br /> 25 Survey As-Built 1 LS $ 1,800.00 $ 1,80000 <br /> 26 Engineer Inspections/Certs 1 LS $ 3,36000 $ 3,36000 <br /> Total Construction: $2562789.20 <br /> PERFORMANCE BOND SURETY AMOUNT 115%OF TOTAL PROJECT $295,307.58 BIZ�I� G <br /> CERTIFICATE OF COST ESTIMATE <br /> I, John M. Boyer, a Florida Professional Engineer, License No. 57970,do hereby certify to Indian River C unty that this <br /> cost estimate has been prepared under my responsible direction for those improvements itemized in this exhibit and that <br /> the total cost estimate is true and accurate to the best of my knowledge. This estimate has been prepared, in part,to <br /> induce approval by theCo of a nal plat for the Millstone Landing Phases 4-6 project, and for the purpose of <br /> establishing prope susociated therewith. <br /> John M. Boy(#, , FL <br /> Senior Project onilineer 1 E. `! !.� ( I <br /> • STATE OF _ O I c L.�� i A <br /> A* <br /> File#1017 �SS�Q <br /> Y-\mm\ProJects\2010k1017\AftQ <br /> (16-0728 Milistone 23rd Street PerformanceAsx) 1655 27th Street,Suite 2 Page 1 of 1 <br /> Vero Beach,Florida 32960 <br /> (772)567-5300 <br />