Laserfiche WebLink
STATE OF FLORIDA DEPARTMENT OF TRANSPORTATION 525.010-44 <br /> LOCAL AGENCY PROGRAM CHECKLIST FOR CONSTRUCTION CONTRACTS (Phase 58) – PROGRAM MANAGEMENT <br /> Ions <br /> FEDERAL AND STATE REQUIREMENTS Pa90 1 of 6 <br /> Project Title. 43rd Avenue Sidewalk Improvements <br /> from Aviation Boulevard to Airport Drive West Federal-Aid Highway(Yes/No)' No <br /> Financial Management Number: 8886-493-A LAP Agreement Amount($)- 478,000.00 <br /> Federal-Aid Project Number: 431725-2-58-01 Scheduled Advertisement Date, 3/12 & 19/2017 <br /> Local Agency Name. Indian River County Specifications Used: FDOT® LAP Big Four❑ Local Agency I� <br /> Materials Certification and Acceptance (MAC) System Use Required (Yes/No): No SHS/NHS Project(Yes/No).No If yes, identify System. N/A <br /> Requirement Reference Local Agency Responsibilities District Monitoring Requirement Location- <br /> Responsibilities <br /> 1 Plan, Specification 23 CFR Submit PS&E package to FDOT for approval. Provide assurance Review/approve signed and Signed and sealed PS&E <br /> &Estimates(PS&E) 635.309(a) that all: sealed PS&E package Package and all Certifications <br /> Submittal AP Agreement must be uploaded to LAPIT prior <br /> L Right-of-way(ROW)clearances, NEPA compliance have been ROW Form#575-095-05 date: to executing this Checklist. <br /> Section 13.08 <br /> completed,and appropriate permits have been obtained. Utility 1/21/16 <br /> LAP Manual and railroad work arrangements and coordination must be made All permits issued must be <br /> and properly noticed in the bid proposal Executed Status of submitted to the Department and <br /> National Environmental Certification and incorporated into the PS&E <br /> Environmental SHS/NHS projects will be designed in accordance with the Plans Determination received from Package. <br /> Policy Act Preparation Manual Non-SHS and Non NHS projects will be DEMO date. <br /> (NEPA) designed in accordance with the Florida Green book 12/16/2015 <br /> Contract Local Agency uses its own Division I Specifications for all project — <br /> Administration types, but includes FDOT's Division 1 Specifications for Local <br /> Core Curriculum Clear Letters received dates, <br /> Manual,FHWA Agencies in the bid document located on the Department's Specs <br /> HIPA-30, on the Web page. Utilities <br /> October 2014 9/23/15 <br /> Local Agency will use FDOT's Division II and Division III <br /> Specifications when the construction project is on the SHS, NHS, Railroad <br /> or greater than$10 million in total costs. For Class C projects N/A <br /> with bridges or box culverts refer to IAP Bulletin 01-14 for <br /> specifications guidance No Permits <br /> When the project is off the SHSand NHS, Local Agency will use N/A <br /> FOOT's pre-approved Big 4 specifications for earthwork,concrete, permits Req. St.Johns River <br /> asphalt,and landscaping items,or will seek FDOT approval for Water Management District and <br /> local agency specifications Army Corps.of Engineers(Both <br /> Pending) <br /> 2. Advertisement 23 USC 112 Local Agency may not advertise until Authorization has been Review bid documents and Section 00100 <br /> received from FDOT.Advertisement must be a minimum of 21 verify minimum.3 week V <br /> 23 CFR days.The project must be advertised in a manner that reaches advertisement and regional <br /> 635.112 all interested bidders. publication. <br />