My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2016-132A
CBCC
>
Official Documents
>
2010's
>
2016
>
2016-132A
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/17/2016 10:45:45 AM
Creation date
10/17/2016 10:45:14 AM
Metadata
Fields
Template:
Official Documents
Official Document Type
Contract
Approved Date
09/13/2016
Control Number
2016-132A
Agenda Item Number
8.L.
Entity Name
Guettler Brothers Construction
Subject
South County Park Gereral Use Field
Area
South County Park
Project Number
1425
Bid Number
2016048
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
236
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
4.01 and 4.05. Paragraph 4 02 refers to OWNER's ARTICLE 9 - ENGINEER'S STATUS DURING <br /> identifying and making available to CONTRACTOR CONSTRUCTION <br /> copies of reports of explorations and tests of <br /> subsurface conditions and drawings of physical <br /> conditions in or relating to existing surface or 901 OWNER'S Representative <br /> subsurface structures at or contiguous to the Site that <br /> have been utilized by ENGINEER in preparing the A. ENGINEER will be OWNER's representative <br /> Contract Documents. during the construction period. The duties and <br /> responsibilities and the limitations of authority of <br /> 806 Insurance ENGINEER as OWNER's representative during <br /> construction are set forth in the Contract Documents <br /> A. OWNER's responsibilities, if any, in respect to and will not be changed without written consent of <br /> purchasing and maintaining liability and property insur- OWNER and ENGINEER. <br /> ance are set forth in Article 5 <br /> 9.02 Visits to Site <br /> 8.07 Change Orders <br /> A. ENGINEER will make visits to the Site at <br /> A. OWNER is obligated to execute Change intervals appropriate to the various stages of construc- <br /> Orders as indicated in paragraph 10 03. tion as ENGINEER deems necessary in order to <br /> observe as an experienced and qualified design <br /> 8.08 Inspections, Tests, and Approvals professional the progress that has been made and the <br /> quality of the various aspects of CONTRACTOR's <br /> A. OWNER's responsibility in respect to certain executed Work. Based on information obtained <br /> inspections, tests, and approvals is set forth in during such visits and observations, ENGINEER, for <br /> paragraph 13.03.B. the benefit of OWNER, will determine, in general, if <br /> the Work is proceeding in accordance with the Con- <br /> 8.09 Limitations on OWNER's Responsibilities tract Documents. ENGINEER will not be required to <br /> make exhaustive or continuous inspections on the Site <br /> A. The OWNER shall not supervise, direct, or to check the quality or quantity of the Work. <br /> have control or authority over, nor be responsible for, ENGINEER's efforts will be directed toward providing <br /> CONTRACTOR's means, methods, techniques, se- for OWNER a greater degree of confidence that the <br /> quences, or procedures of construction, or the safety completed Work will conform generally to the Contract <br /> precautions and programs incident thereto, or for any Documents. On the basis of such visits and <br /> failure of CONTRACTOR to comply with Laws and observations, ENGINEER will keep OWNER informed <br /> Regulations applicable to the performance of the of the progress of the Work and will endeavor to guard <br /> Work. OWNER will not be responsible for OWNER against defective Work. <br /> CONTRACTOR's failure to perform the Work in <br /> accordance with the Contract Documents. B. ENGINEER's visits and observations are <br /> subject to all the limitations on ENGINEER's authority <br /> 810 Undisclosed Hazardous Environmental and responsibility set forth in paragraph 9.10, and <br /> Condition particularly, but without limitation, during or as a result <br /> of ENGINEER's visits or observations of <br /> A. OWNER's responsibility in respect to an CONTRACTOR's Work ENGINEER will not <br /> undisclosed Hazardous Environmental Condition is supervise, direct, control, or have authority over or be <br /> set forth in paragraph 4 06 responsible for CONTRACTOR's means, methods, <br /> techniques, sequences, or procedures of construction, <br /> 811 Evidence of Financial Arrangements or the safety precautions and programs incident <br /> thereto, or for any failure of CONTRACTOR to comply <br /> A. If and to the extent OWNER has agreed to with Laws and Regulations applicable to the <br /> furnish CONTRACTOR reasonable evidence that performance of the Work. <br /> financial arrangements have been made. to satisfy <br /> OWNER's obligations under the Contract Documents, 9.03 Project Representative <br /> OWNER's responsibility in respect thereof will be as <br /> set forth in the Supplementary Conditions. A. If OWNER and ENGINEER agree, ENGI- <br /> NEER will furnish a Resident Project Representative <br /> to assist ENGINEER in providing more extensive <br /> observation of the Work. The responsibilities and <br /> 00700-General Conditions REV 510-13 <br /> 00700-28 <br /> F 1Public WorksTNGINEERING DNISION PROJECTS\1425 S County Park-General Use FieldWdmin\bid documents\Master Contract Documents\00700-General Conditions REV 510- <br /> 13.doc <br />
The URL can be used to link to this page
Your browser does not support the video tag.