Laserfiche WebLink
C If ENGINEER does not render a formal 2. Cost of all materials and equipment <br /> decision in writing within the time stated in paragraph furnished and incorporated in the Work, includ- <br /> 10.05 B, a decision denying the Claim in its entirety ing costs of transportation and storage thereof, <br /> shall be deemed to have been issued 31 days after and Suppliers' field services required in <br /> receipt of the last submittal of the claimant or the last connection therewith. All cash discounts shall <br /> submittal of the opposing party, if any accrue to CONTRACTOR unless OWNER <br /> deposits funds with CONTRACTOR with which <br /> D. No Claim for an adjustment in Contract Price to make payments, in which case the cash <br /> or Contract Times (or Milestones) will be valid if not discounts shall accrue to OWNER. All trade <br /> submitted in accordance with this paragraph 10.05. discounts, rebates and refunds and returns <br /> from sale of surplus materials and equipment <br /> shall accrue to OWNER, and CONTRACTOR <br /> ARTICLE 11 -COST OF THE WORK; CASH shall make provisions so that they may be <br /> ALLOWANCES, UNIT PRICE WORK obtained <br /> 3. Payments made by CONTRACTOR <br /> 11 01 Cost of the Work to Subcontractors for Work performed by <br /> Subcontractors. If required by OWNER, LON- <br /> A. Costs Included. The term Cost of the Work TRACTOR shall obtain competitive bids from <br /> means the sum of all costs necessarily incurred and subcontractors acceptable to OWNER and <br /> paid by CONTRACTOR in the proper performance of CONTRACTOR and shall deliver such bids to <br /> the Work. When the value of any Work covered by a OWNER, who will then determine, with the <br /> Change Order or when a Claim for an adjustment in advice of ENGINEER, which bids, if any, will be <br /> Contract Price is determined on the basis of Cost of acceptable. If any subcontract provides that the <br /> the Work, the costs to be reimbursed to Subcontractor is to be paid on the basis of Cost <br /> CONTRACTOR will be only those additional or of the Work plus a fee, the Subcontractor's <br /> incremental costs required because of the change in Cost of the Work and fee shall be determined <br /> the Work or because of the event giving rise to the in the same manner as CONTRACTOR's Cost <br /> Claim. Except as otherwise may be agreed to in of the Work and fee as provided in this para- <br /> writing by OWNER, such costs shall be in amounts no graph 11.01 <br /> higher than those prevailing in the locality of the <br /> Project, shall include only the following items, and 4 Costs of special consultants <br /> shall not include any of the costs itemized in para- (including but not limited to engineers, <br /> graph 1101.13 architects, testing laboratories, surveyors, <br /> attomeys, and accountants) employed for <br /> 1 PaYMII GStS for employees in the services specifically related to the Work. <br /> d*FeGt employ of CONTRACTOR On the perfer <br /> 5 Supplemental costs including the <br /> GlassifiGatiGRs agFeed upon by OWNER and following: <br /> GQNTRAr__TQR. employees shall inGlude <br /> without limitation supe ntenaents, foremen, a. The proportion of necessary trans- <br /> and ether peFsennel employed full time at the portation, travel, and subsistence expenses of <br /> Site. Payroll GGStS foF employees not employed CONTRACTOR's employees incurred in dis- <br /> full tome en the Work shall be appGrtioned on of duties connected with the Work. <br /> the basis of #heir +- spent GR the in GFk <br /> PayFell GGStS shall iAGlude, but not be limited , b. Cost, including transportation and <br /> salaries and wages plus the nest of fringe maintenance, of all materials, supplies, equip- <br /> benefits, whish shall inGlude SA i. seGU�P,f ment, machinery, appliances, office, and <br /> eentributiens, Unemployment, e*sise, and temporary facilities at the Site, and hand tools <br /> not owned by the workers,which are consumed <br /> and retirement benefits, bonuses, S,Gkleave, in the performance of the Work, and cost, less <br /> YaGation and holiday pay appliGable the-Fete. market value, of such items used but not con- <br /> The expenses of perfermine ` ark outside of sumed which remain the property of CON- <br /> TRACTOR. <br /> legal holidays, shall be iRGIuded in the above te <br /> the extent a hhorzed by OWAICD <br /> 00710-General Conditions REV 5-10-13 <br /> 00700-32 <br /> FAPublic WorksIENGINEERING DIVISION PROJECTS\1425-S County Park-General Use FieldMmintbid documentslMaster Contract Documents\00700-General Conditions REV 5-10- <br /> 13.doc <br />