equal to the time lost due to such delay shall be <br /> CONTRACTOR's sole and exclusive remedy for such 13 03 Tests and Inspections <br /> delay. <br /> A. CONTRACTOR shall give ENGINEER timely <br /> 12.06 Delay Damages notice of readiness of the Work for all required <br /> inspections, tests, or approvals and shall cooperate <br /> A. In no event shall OWNER or ENGINEER be with inspection and- testing personnel to facilitate <br /> liable to CONTRACTOR, any Subcontractor, any required inspections or tests. <br /> Supplier, or any other person or organization, or to any <br /> surety for or employee or agent of any of them, for B. OWNER—shall empley—and may-fbF the- <br /> damages <br /> t1edamages arising out of or resulting from se-i-es of an independent testing laberateFy to <br /> 1 delays caused by or within the control the QGRtFaGt DOGUFnesits eXGept: <br /> of CONTRACTOR, or <br /> 1. fer inspesfiGFIS, tests, eF appFevals <br /> 2. delays beyond the control of both GGYeFed by paragFaphs 13.03.G and 13.03.D <br /> OWNER and CONTRACTOR including but not belew; <br /> limited to fires, floods, epidemics, abnormal <br /> weather conditions, acts of God, or acts or 2. that Gests FT-ed i;a-seaeestien with <br /> neglect by utility owners or other contractors <br /> performing other work as contemplated by PaFagFaph 13.04.13 shall be paid as pmvided <br /> Article 7 said paFagFaph 13.04.13, aPA <br /> B. Nothing in this paragraph 12.06 bars a 3. as-othepwise speGifiGally provided '^ <br /> change in Contract Price pursuant to this Article 12 to . <br /> compensate CONTRACTOR due to delay, <br /> interference, or disruption directly attributable to C. If Laws or Regulations of any public body <br /> actions or inactions of OWNER or anyone for whom having jurisdiction require any Work (or part thereof) <br /> OWNER is responsible. specifically to be inspected, tested, or approved by an <br /> employee or other representative of such public body, <br /> CONTRACTOR shall assume full responsibility for <br /> ARTICLE 13-TESTS AND INSPECTIONS; arranging and obtaining such inspections, tests, or <br /> CORRECTION, REMOVAL OR ACCEPTANCE OF approvals, pay all costs in connection therewith, and <br /> DEFECTIVE WORK furnish ENGINEER the required certificates of inspec- <br /> tion or approval. <br /> 13 01 Notice of Defects D CONTRACTOR shall be responsible for <br /> arranging and obtaining and shall pay all costs in <br /> A. Prompt notice of all defective Work of which connection with any inspections, tests, or approvals <br /> OWNER or ENGINEER has actual knowledge will be required for OWNER's and ENGINEER's acceptance <br /> given to CONTRACTOR. All defective Work may be of materials or equipment to be incorporated in the <br /> rejected, corrected, or accepted as provided in this Work; or acceptance of materials, mix designs, or <br /> Article 13. equipment submitted for -approval prior to <br /> CONTRACTOR's purchase thereof for incorporation <br /> 13 02 Access to Work in the Work. Such inspections, tests, or approvals <br /> shall be performed by organizations acceptable to <br /> A. OWNER, ENGINEER, ENGINEER's Con- OWNER and ENGINEER. <br /> sultants, other representatives and personnel of <br /> OWNER, independent testing laboratories, and E. If any Work (or the work of others) that is to <br /> governmental agencies with jurisdictional interests will be inspected, tested, or approved is covered by CON- <br /> have access to the Site and the Work at reasonable TRACTOR without written concurrence of ENGI- <br /> times for their observation, inspecting, and testing. NEER, it must, if requested by ENGINEER, be uncov- <br /> CONTRACTOR shall provide them proper and safe ered for observation. <br /> conditions for such access and advise them of <br /> CONTRACTOR's Site safety procedures and F. Uncovering Work as provided in paragraph <br /> programs so that they may comply therewith as 13.03 E shall be at CONTRACTOR's expense unless <br /> applicable. CONTRACTOR has given ENGINEER timely notice <br /> 00700-General Conditions REV 5-10-13 <br /> 00700-36 <br /> 1`1Public WorksIENGINEERING DIVISION PROJECTS11425-S County Park-General Use Field\Admin\bid documents\Master Contract Documents\00700-General Conditions REV 5-10- <br /> 13.doc <br />