My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2016-132A
CBCC
>
Official Documents
>
2010's
>
2016
>
2016-132A
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/17/2016 10:45:45 AM
Creation date
10/17/2016 10:45:14 AM
Metadata
Fields
Template:
Official Documents
Official Document Type
Contract
Approved Date
09/13/2016
Control Number
2016-132A
Agenda Item Number
8.L.
Entity Name
Guettler Brothers Construction
Subject
South County Park Gereral Use Field
Area
South County Park
Project Number
1425
Bid Number
2016048
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
236
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SECTION 01340 <br /> SUBMITTAL OF SHOP DRAWINGS <br /> B. Prior to submission, thoroughly check shop drawings, product data, and <br /> samples for completeness and for compliance with the Contract <br /> Documents, verify all dimensions and field conditions, and coordinate the <br /> shop drawings with the requirements for other related work. Also review <br /> each shop drawing before submitting it to the ENGINEER to determine <br /> that it is acceptable in terms of the means, methods, techniques, <br /> sequences and operations of construction, safety precautions and <br /> programs incidental thereto, all of which are the CONTRACTOR's <br /> responsibility. <br /> 1. It is CONTRACTOR'S responsibility to review submittals made by <br /> his suppliers and Subcontractors before transmitting them to <br /> ENGINEER to assure proper coordination of the Work and to <br /> determine that each submittal is in accordance with its desires and <br /> that there is sufficient information about materials and equipment <br /> for ENGINEER to determine compliance with the Contract <br /> Documents. <br /> 2. Incomplete or inadequate submittals will be returned for revision <br /> without review. <br /> C. The CONTRACTOR's responsibility for errors and omissions in submittals <br /> is not relieved by the ENGINEER's review of submittals. The <br /> CONTRACTOR shall approve the shop drawings based on his in-the-field <br /> measurements, prior to submittal to the ENGINEER for his review. <br /> D. Notify the ENGINEER, in writing at the time of submission, of deviations in <br /> submittals from the requirements of the Contract Documents. The <br /> CONTRACTOR's responsibility for deviations in submittals from the <br /> requirements of the Contract Documents is not relieved by the <br /> ENGINEER's review of submittals, unless the ENGINEER gives written <br /> acceptance of specific deviations. <br /> E. Begin no work, which requires submittals until return of submittals with the <br /> ENGINEER's stamp and initials or signature indicating the submittal has <br /> been reviewed. <br /> 1.6 SUBMITTAL REQUIREMENTS AND ENGINEER'S REVIEW FOR SHOP <br /> DRAWINGS, PRODUCT DATA AND SAMPLES <br /> A. Submit to: <br /> Indian River County <br /> Engineering Division <br /> 1801 27th Street <br /> Vero Beach, FL 32960 <br /> 01340-Submittal of Shop Drawings <br /> 01340-2 <br /> F-\Public Works\ENGINEERING DIVISION PROJECTS\1425-S County Park-General Use FieldWdmin\bid documents\MasterContract <br /> Documents\01340-Submittal of Shop Drawings.doc <br />
The URL can be used to link to this page
Your browser does not support the video tag.