My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2016-132A
CBCC
>
Official Documents
>
2010's
>
2016
>
2016-132A
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/17/2016 10:45:45 AM
Creation date
10/17/2016 10:45:14 AM
Metadata
Fields
Template:
Official Documents
Official Document Type
Contract
Approved Date
09/13/2016
Control Number
2016-132A
Agenda Item Number
8.L.
Entity Name
Guettler Brothers Construction
Subject
South County Park Gereral Use Field
Area
South County Park
Project Number
1425
Bid Number
2016048
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
236
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SECTION 01340 <br /> SUBMITTAL OF SHOP DRAWINGS <br /> E. All submittals shall bear the stamp of approval and signature of <br /> CONTRACTOR as evidence that they have been reviewed by <br /> CONTRACTOR. Submittals without this stamp of approval will not be <br /> reviewed by the ENGINEER and will be returned to CONTRACTOR. <br /> F. Assign a number to each submittal starting with No. 1 and thence <br /> numbered consecutively. Identify resubmittals by the original submittal <br /> number followed by the suffix "A" for the first resubmittal, the suffix "B" for <br /> the second resubmittal, etc. <br /> G. Initially submit to ENGINEER a minimum of six (6) copies of all submittals <br /> that are on 11-inch by 17-inch or smaller sheets (no less than 8 1/2-inch x <br /> 11-inch), and one unfolded sepia and 2 prints made from that sepia for all <br /> submittals on sheets larger than 11-inch by 17-inch. <br /> H. After ENGINEER completes his review, Shop Drawings will be marked <br /> with one of the following notations: <br /> 1. Approved <br /> 2. Approved as Corrected <br /> 3. Approved as Corrected - Resubmit <br /> 4. Revise and Resubmit <br /> 5. Not Approved <br /> I. If a submittal is acceptable, it will be marked "Approved" or "Approved as <br /> Corrected". Three (3) prints or copies of the submittal will be returned to <br /> CONTRACTOR. <br /> J. Upon return of a submittal marked "Approved" or "Approved as <br /> Corrected", CONTRACTOR may order, ship or fabricate the materials <br /> included on the submittal, provided it is in accordance with the corrections <br /> indicated. <br /> K. If a Shop Drawing marked "Approved as Corrected" has extensive <br /> corrections or corrections affecting other drawings or Work, ENGINEER <br /> may require that CONTRACTOR make the corrections indicated thereon <br /> and resubmit the Shop Drawings for record purposes. Such drawings will <br /> have the notation, "Approved as Corrected - Resubmit." <br /> L. If a submittal is unacceptable, three (3) copies will be returned to <br /> CONTRACTOR with one of the following notations: <br /> 1. "Revise and Resubmit" <br /> 2. "Not Approved" <br /> 01340-Submittal of Shop Drawings <br /> 01340-5 <br /> P\Public Warks\ENGINEERING DIVISION PROJECTS\1425-S County Park-General Use FielMdmin\bid documents\Nlaster Contract <br /> Documents\01340-Submittal of Shop Drawings.doc <br />
The URL can be used to link to this page
Your browser does not support the video tag.