My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2016-132A
CBCC
>
Official Documents
>
2010's
>
2016
>
2016-132A
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/17/2016 10:45:45 AM
Creation date
10/17/2016 10:45:14 AM
Metadata
Fields
Template:
Official Documents
Official Document Type
Contract
Approved Date
09/13/2016
Control Number
2016-132A
Agenda Item Number
8.L.
Entity Name
Guettler Brothers Construction
Subject
South County Park Gereral Use Field
Area
South County Park
Project Number
1425
Bid Number
2016048
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
236
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SECTION 01520 <br /> CONSTRUCTION FACILITIES AND TEMPORARY CONTROLS <br /> 1.1 SCOPE <br /> A. Provide all construction equipment and facilities and temporary controls <br /> required to satisfactorily complete the work represented on the Drawings <br /> and described in the Specifications. <br /> 1.2 RESPONSIBILITY <br /> A. All construction facilities and temporary controls remain the property of the <br /> Contractor establishing them and shall be maintained in a safe and useful <br /> condition until removed from the construction site. <br /> B. All false work, scaffolding, ladders, hoistways, braces, pumps, roadways, <br /> sheeting, forms, barricades, drains, flumes, and the like, any of which may <br /> be needed in construction of any part of the work and which are not herein <br /> described or specified in detail, must be furnished, maintained and <br /> removed by the CONTRACTOR, who is responsible for the safety and <br /> efficiency of such work and for any damage that may result from their <br /> failure or from their improper construction, maintenance or operation. <br /> C. In accepting the Contract, the CONTRACTOR assumes full responsibility <br /> for the sufficiency and safety of all hoists, cranes, temporary structures or <br /> work and for any damage which may result from their failure or their <br /> improper construction, maintenance or operation and will indemnify and <br /> save harmless the OWNER and ENGINEER from all claims, suits or <br /> actions and damages or costs of every description arising by reason of <br /> failure to comply with the above provision. <br /> 1.3 TEMPORARY UTILITIES AND SERVICES <br /> A. TEMPORARY WATER <br /> 1. Provide a temporary water service as required for all construction <br /> purposes and pay for all water used. <br /> 2. Furnish potable drinking water in suitable dispensers and with cups <br /> for use of all employees at the job. <br /> 3. Provide all temporary piping, hoses, etc., required to transport <br /> water to the point of usage by all trades. <br /> 4. When temporary water service is no longer required, remove all <br /> temporary water lines. <br /> 01520-1 <br /> F•\Public Works\ENGINEERING DIVISION PROJECTS\1425-S County Park-General Use Field\Admin\bid documents\Master <br /> Contract Documents\01520-Construction Facilities.doc <br />
The URL can be used to link to this page
Your browser does not support the video tag.