My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2016-132A
CBCC
>
Official Documents
>
2010's
>
2016
>
2016-132A
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/17/2016 10:45:45 AM
Creation date
10/17/2016 10:45:14 AM
Metadata
Fields
Template:
Official Documents
Official Document Type
Contract
Approved Date
09/13/2016
Control Number
2016-132A
Agenda Item Number
8.L.
Entity Name
Guettler Brothers Construction
Subject
South County Park Gereral Use Field
Area
South County Park
Project Number
1425
Bid Number
2016048
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
236
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SECTION 01541 <br /> PROTECTION OF THE WORK AND PROPERTY <br /> 1.3 TREE AND PLANT PROTECTION <br /> A. Protect existing trees, shrubs and plants on or adjacent to the site that are <br /> shown or designated to remain in place against unnecessary cutting, breaking or <br /> skinning of trunk, branches, bark or roots. <br /> B. Do not store or park materials or equipment within the drip line. <br /> C. Install temporary fences or barricades to protect trees and plants in areas <br /> subject to traffic. <br /> D. Fires shall not be permitted under or adjacent to trees and plants. <br /> E. Within the limits of the Work, water trees and plants that are to remain, in order <br /> to maintain their health during construction operations. <br /> F. Cover all exposed roots with burlap and keep it continuously wet. Cover all <br /> exposed roots with earth as soon as possible. Protect root systems from <br /> mechanical damage and damage by erosion, flooding, run-off or noxious <br /> materials in solution. <br /> G. If branches or trunks are damaged, prune branches immediately and protect the <br /> cut or damaged areas with emulsified asphalt compounded specifically for <br /> horticultural use. <br /> H. Remove all damaged trees and plants that die or suffer permanent injury and <br /> replace them with a specimen of equal or better quality. <br /> I. Coordinate Work in this Section with requirements of other sections herein. <br /> 1.4 PROTECTION OF IRRIGATION <br /> The CONTRACTOR shall be responsible for maintaining in good condition all <br /> irrigation systems within the easements, which could be damaged by <br /> construction activities. The CONTRACTOR shall repair any irrigation systems <br /> damaged by construction activities within two (2) days. The CONTRACTOR shall <br /> be responsible for maintaining the functionality of the remaining portion of the <br /> system if it should fall outside of the right-of-way. <br /> 1.5 PROTECTION OF EXISTING STRUCTURES <br /> A. Underground Structures: <br /> 01541-2 F\Public Works\ENG I NEER ING DIVISION <br /> PROJECTS\1425- S County Park-General Use Field\Admin\bid documentswaster Contract DocumentsM541 - Protection of <br /> Property.doc <br />
The URL can be used to link to this page
Your browser does not support the video tag.