My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2016-132A
CBCC
>
Official Documents
>
2010's
>
2016
>
2016-132A
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/17/2016 10:45:45 AM
Creation date
10/17/2016 10:45:14 AM
Metadata
Fields
Template:
Official Documents
Official Document Type
Contract
Approved Date
09/13/2016
Control Number
2016-132A
Agenda Item Number
8.L.
Entity Name
Guettler Brothers Construction
Subject
South County Park Gereral Use Field
Area
South County Park
Project Number
1425
Bid Number
2016048
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
236
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SECTION 01541 <br /> PROTECTION OF THE WORK AND PROPERTY <br /> 1.6 DAMAGE TO EXISTING STRUCTURES AND UTILITIES <br /> A. The CONTRACTOR shall be responsible for and make good all damage to <br /> pavement beyond the limits of this Contract, buildings, telephone or other <br /> cables, water pipes, sanitary pipes, or other structures which may be <br /> encountered, whether or not shown on the Drawings. <br /> B. Information shown on the Drawings as to the location of existing utilities has <br /> been prepared from the most reliable data available to the Engineer. This <br /> information is not guaranteed, however, and it shall be this CONTRACTOR's <br /> responsibility to determine the location, character and depth of any existing <br /> utilities. He shall assist the utility companies, by every means possible to <br /> determine said locations. Extreme caution shall be exercised to eliminate any <br /> possibility of any damage to utilities resulting from his activities. <br /> 1.7 ADJUSTMENTS OF UTILITY CASTINGS, COVERS AND BOXES <br /> A. All existing utility castings, including valve boxes, junction boxes, manholes, pull <br /> boxes, inlets and similar structures in the areas of construction that are to <br /> remain in service shall be adjusted by the CONTRACTOR to bring them flush <br /> with the surface of the finished work. <br /> B. The CONTRACTOR shall coordinate the utilities to ensure proper construction <br /> sequencing. CONTRACTOR shall make available survey reference markers to <br /> the various utility companies. <br /> + + END OF SECTION + + <br /> 01541-5 F\Public Works\ENGINEERING DIVISION <br /> PROJECTS\1425- S County Park-General Use Field\Admin\bid documents\Master Contract Documents\01541 - Protection of <br /> Property.doc <br />
The URL can be used to link to this page
Your browser does not support the video tag.