Laserfiche WebLink
4. CONTRACTOR understands and agrees that "pollution" as defined by Florida Statutes <br /> Chapter 403.031(7) includes: ". . . the presence in the outdoor atmosphere or waters of <br /> the state of any substances, contaminants, noise, or manmade or human-induced <br /> impairment of air or waters or alteration of the chemical, physical, biological, or <br /> radiological integrity of air or water in quantities or at levels which are or may be <br /> potentially harmful or injurious to human health or welfare, animal or plant life, or <br /> property or which unreasonably interfere with the enjoyment of life or property, <br /> including outdoor recreation unless authorized by applicable law." <br /> 5. CONTRACTOR understands and agrees that in addition to the definition set forth in <br /> Item 4 above, "pollution" is also defined by Florida Administrative Code 62-302.530 <br /> and as may be further defined in the Indian River County permit(s). <br /> 6. CONTRACTOR understands that Indian River County requires the design, installation, <br /> and maintenance of proper erosion control measures at all times UNTIL Final <br /> Acceptance of the Project by the OWNER. <br /> 7. CONTRACTOR understands that there are civil and criminal penalties for pollution <br /> listed in Florida Statutes Ch. 403.141 and Ch. 403.161 and that there are other <br /> penalties listed in Indian River County's permits, including but not limited to, Indian <br /> River County issuing a Cease and Desist Order for the project. CONTRACTOR <br /> understands that it may be liable for these and other penalties if offsite pollution occurs <br /> as a result of activities associated with the Project. <br /> 8. Transfer of Ownership or County Issued Permits: <br /> (a) Transfer of Interest in Real Property: Within twenty-one (21) days of any transfer of <br /> ownership or control of the real property at which the permitted activity, facility, or <br /> system is located or authorized, the Permittee shall notify in writing, both the Indian <br /> River County Engineering Division and the Indian River County Stormwater Division <br /> of the transfer. Permittee shall provide the name, mailing address, and telephone <br /> number of the transferee and a copy of the instrument effectuating the transfer. <br /> Said notification is in addition to notifying the County Attorney's Office as required <br /> by County Code. <br /> (b) Transfer of a County Permit. To transfer a County issued permit, Permittee must <br /> provide (1) the information required in Item 8(a); (2) a written statement from the <br /> proposed transferee that it will be bound by all terms and conditions of the permit; <br /> and (3) a new "Permittee's Affidavit" form properly executed by the transferee. <br /> Upon proper receipt of these items the County shall transfer the permit to the <br /> transferee. <br /> (c) Permittee is encouraged to request a permit transfer prior to the sale or legal <br /> transfer of the real property at which a permitted facility, system, or activity is <br /> located or authorized. However, the transfer shall not be effective prior to the sale <br /> or legal transfer. <br /> (d) An "Illicit Discharge Sign" must be present at the site at the time of transfer. <br /> Replacement or additional signs may be obtained from the Indian River County <br /> Public Works Department at a cost of$30.00 per sign. <br /> 01025-21 Technical Specifications <br /> F\Public Works\ENGINEERING DIVISION PROJECTS\1425-S County Park-General Use Field\Admin\bid documents\Master Contract <br /> Documents\Technical Specifications.doc <br />