Laserfiche WebLink
contact and shall be firmly and smoothly embedded by light tamping with appropriate <br /> tools. <br /> Where sodding is used in drainage ditches, the setting of the pieces shall be staggered <br /> so as to avoid a continuous seam along the line of flow. Along the edges of such <br /> staggered areas, the offsets of individual strips shall not exceed 6 inches. In order to <br /> prevent erosion caused by vertical edges at the outer limits, the outer pieces of sod <br /> shall be tamped so as to produce a featheredge effect. <br /> Where sodding is placed abutting paved shoulder, the contractor is to ensure that the <br /> finished sod elevation is 1 Y2' below paved shoulder. <br /> On slopes greater than 3:1, the Contractor shall prevent the sod from sliding by means <br /> of wooden pegs driven through the sod blocks into firm earth, at suitable intervals. <br /> Sodding shall not be performed when weather and soil conditions are, in the <br /> Engineer's opinion, unsuitable for proper results. <br /> Sod shall be placed around all structures, equipment pads, etc. <br /> I. Watering: The areas on which the sod is to be placed shall contain sufficient moisture, <br /> as determined by the Engineer, for optimum results. After being placed, the sod shall <br /> be kept in a moist condition to the full depth of the rooting zone for at least 2 weeks. <br /> Thereafter, the Contractor shall apply water as needed until the sod roots and starts to <br /> grow for a minimum of 60 days (or until final acceptance, whichever is latest). <br /> J. Maintenance: The Contractor shall, at his expense, maintain the sodded areas in a <br /> satisfactory condition until final acceptance of the project. Such maintenance shall <br /> include repairing of any damaged areas and replacing areas in which the establishment <br /> of the grass stand does not appear to be developing satisfactorily. <br /> Replanting or repair necessary due to the Contractor's negligence, carelessness or <br /> failure to provide routine maintenance shall be at the Contractor's expense. <br /> The Contractor shall maintain the sodded area up to the final acceptance date as <br /> directed by the Engineer. Grass height shall not exceed 6"without mowing. Clippings <br /> shall be removed from sidewalk. <br /> K. Article 570-9. The first two paragraphs under this Article are deleted and the <br /> following is added: <br /> The contract unit price for performance turf shall include the costs of sod, fertilizer (2 <br /> applications), sidewalk sweeping after mowing, mowing, pegging disposal of clippings, <br /> water, tools, equipment, labor and all other incidentals necessary. <br /> Item of Payment <br /> Payment shall be made under: <br /> Bid Item No. 570-1 — Performance Turf (Sod) (Bahia) - Per Square Yard <br /> 01025-28 Technical Specifications <br /> F-\Public Works\ENGINEERING DIVISION PROJECTS\1425-S County Park-General Use Field\Admin\bid documents\Master Contract <br /> Documents\Technical Specifications.doc <br />