Laserfiche WebLink
"EXHIBIT A" <br /> CONDITIONS FOR ISSUANCE OF PERMIT NUMBER 104191-5 <br /> IRC Intergenerational Recreation Center- General Use Field <br /> DATED April 21, 2016 <br /> 1. All activities shall be implemented following the plans, specifications and performance <br /> criteria approved by this permit. Any deviations must be authorized in a permit modification <br /> in accordance with Rule 62-330.315, F.A.C. Any deviations that are not so authorized may <br /> subject the permittee to enforcement action and revocation of the permit under Chapter <br /> 373, F.S. <br /> 2. A complete copy of this permit shall be kept at the work site of the permitted activity during <br /> the construction phase, and shall be available for review at the work site upon request by <br /> the District staff. The permittee shall require the contractor to review the complete permit <br /> prior to beginning construction. <br /> 3. Activities shall be conducted in a manner that does not cause or contribute to violations of <br /> state water quality standards. Performance-based erosion and sediment control best <br /> management practices shall be installed immediately prior to, and be maintained during <br /> and after construction as needed, to prevent adverse impacts to the water resources and <br /> adjacent lands. Such practices shall be in accordance with the State of Florida Erosion and <br /> Sediment Control Designer and Reviewer Manual (Florida Department of Environmental <br /> Protection and Florida Department of Transportation June 2007), and the Florida <br /> Stormwater Erosion and Sedimentation Control Inspector's Manual (Florida Department of <br /> Environmental Protection, Nonpoint Source Management Section, Tallahassee, Florida, <br /> July 2008), which are both incorporated by reference in subparagraph 62-330.050(9)(b)5, <br /> F.A.C., unless a project-specific erosion and sediment control plan is approved or other <br /> water quality control measures are required as part of the permit. <br /> 4. At least 48 hours prior to beginning the authorized activities, the permittee shall submit to <br /> the District a fully executed Form 62-330.350(1), "Construction Commencement <br /> Notice,"[10-1-13], incorporated by reference herein <br /> (http://www.flrules.org/Gateway/reference.asp?No=Ref-02505), indicating the expected <br /> start and completion dates. A copy of this form may be obtained from the District, as <br /> described in subsection 62-330.010(5), F.A.C. If available, an District website that fulfills <br /> this notification requirement may be used in lieu of the form. <br /> 5. Unless the permit is transferred under Rule 62-330.340, F.A.C., or transferred to an <br /> operating entity under Rule 62-330.310, F.A.C., the permittee is liable to comply with the <br /> plans, terms and conditions of the permit for the life of the project or activity. <br /> 6. Within 30 days after completing construction of the entire project, or any independent <br /> portion of the project, the permittee shall provide the following to the Agency, as applicable: <br /> a. For an individual, private single-family residential dwelling unit, duplex, triplex, or <br /> quadruplex—"Construction Completion and Inspection Certification for Activities <br /> Associated With a Private Single-Family Dwelling Unit" [Form 62-330.310(3)1; or <br /> b. For all other activities—"As-Built Certification and Request for Conversion to <br /> Operational Phase" [Form 62-330.310(1)]. <br /> c. If available, an Agency website that fulfills this certification requirement may be used <br /> in lieu of the form. <br />