Laserfiche WebLink
Millstone Landing Complete 2009 <br /> Reference Contact: Steve Moler <br /> Masteller&Moler, Inc. <br /> www.MastellerMoler.com <br /> Vero Beach, Florida <br /> Ph. (772) 567-5300—Fax. (772) 794-1106 <br /> Project Scope: New Construction of a 300 Acres Subdivision, the project included. <br /> Excavation of 634,000+/- CY of fill and Embankment of over <br /> 800,000 CY of fill including 250,000 CY of Borrow excavation <br /> form offsite <br /> Contract Amount: $16,478,000.00 <br /> Superintendent: Dave Morgan <br /> Other References and Notable Projects as a Subcontractor <br /> Reference Contact: Bob Schafer,Exec.Vice President Ranger <br /> Construction Industries,Inc. (561)793-9400 <br /> Palm Beach Operations(407)656-9255 Orlando <br /> Operations(772)370-1598 Mobile <br /> Bob.Schafer@rangerconstruction.com <br /> Scope:SR 414 and 429 Orlando Expressway Subcontractor to Ranger Construction Both projects includes <br /> over 3 Million yards of excavation and embankment. <br /> Reference Contact: Brian Beetle <br /> Community Asphalt OHL Group <br /> General Manager,Vero Beach Phone: <br /> (772)770-3771 <br /> Fax:(772)770-3707 <br /> bbeetle@cacorp.net <br /> Scope:I-95 From SR192 to Wickham Road project included 800,000+CY of pond excavation and <br /> embanlanent,along with Subgrade Base Rock and Paving. <br /> Other notable proiects completed as prime contractor for the <br /> SF VAU) include the: <br /> C=44 Impacted Soils Contract No. 4600003185, RFB No. 6000000677 <br /> 500,000 CY of Excavation <br /> C-24 Canal Bank Repairs RFB NO. 6000000430 <br /> 250,000 CY of Canal Excavation <br /> More references can be provided if needed. <br />