My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2016-132A
CBCC
>
Official Documents
>
2010's
>
2016
>
2016-132A
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/17/2016 10:45:45 AM
Creation date
10/17/2016 10:45:14 AM
Metadata
Fields
Template:
Official Documents
Official Document Type
Contract
Approved Date
09/13/2016
Control Number
2016-132A
Agenda Item Number
8.L.
Entity Name
Guettler Brothers Construction
Subject
South County Park Gereral Use Field
Area
South County Park
Project Number
1425
Bid Number
2016048
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
236
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
2 <br /> Utilities <br /> Indian River County Utilities—Water/Sewer <br /> Indian River County Telecommunications— Fiber <br /> FPL— Electric <br /> Other Issues <br /> • Maintenance of Traffic <br /> o CHANGE — RPM's shall be installed per FDOT Standard Index (Sheet C2 of <br /> C5, Traffic Control Note 11) —James Ennis noted that the County had <br /> updated their policy to be consistent with the FDOT Standard Index <br /> placement practices for retroreflective pavement markers (RPM'S). <br /> o Shall be coordinated with IRC Traffic—James Ennis noted that any road <br /> closures and or lane closures or MOT device installation would be required <br /> to be coordinated through IRC Traffic Operations <br /> • Buffers to remain <br /> o Oslo Rd — 60ft <br /> o 20th Ave SW—40ft <br /> o James Ennis noted that the Contractor would need to account for staying <br /> out of the drip line with heavy equipment for specimen trees that were <br /> noted to be left in place and that any damage to the root systems could <br /> result in additional costs to the Contractor. <br /> • IRCUD Water Well onsite — DO NOT DISTURB—50ft exclusion radius <br /> • Permits <br /> o St. Johns River Water Management District— issued <br /> o IRC Land Clearing— issued <br /> o IRC Tree Removal — issued <br /> o IRC Type A Storm Water Management System Permit— issued <br /> o The CONTRACTOR shall obtain any other required permits for construction. <br /> Questions noted requiring answers <br /> -James Ennis noted that all questions would have a formal written response that would <br /> be supplied to the potential bidders. <br /> 1. Location of the Stockpile indicated in the Bid Docs (5000-CY)? <br /> 2. Type of Sod required? <br /> 3. Access to Stockpile (Will IRC allow access along backside of storm water Pond?) <br /> 4. Clarification regarding exclusion area around IRCUD well. <br /> DEADLINE FOR QUESTIONS IS 8:30 A.M., MONDAY AUGUST 15th, 2015 <br /> F\Public\Yorks\ENGINEERING DIVISION PROJECTS\1425-S County Park-General Use Eield\Admm\bid documents\Pre-bid Meeting\IRC-1425_Pre- <br /> bid Meetma Minutes 20160S10.doc <br />
The URL can be used to link to this page
Your browser does not support the video tag.