Laserfiche WebLink
SECTION 00520 -Agreement (Public Works) <br /> THIS AGREEMENT is by and between INDIAN RIVER COUNTY, a Political Subdivision of the <br /> State of Florida organized and existing under the Laws of the State of Florida, (hereinafter called <br /> OWNER) <br /> and Guettler Brothers Construction, LLC <br /> (hereinafter called CONTRACTOR). <br /> OWNER and CONTRACTOR, in consideration of the mutual covenants hereinafter set forth, <br /> agree as follows, <br /> ARTICLE 1 -WORK <br /> 1.01 CONTRACTOR shall complete all Work as specified or indicated in the Contract <br /> Documents. The Work is generally described as follows: <br /> The proposed project consists of clearing, filling, grading, and sodding <br /> approximately 5.21 acres for a General Use Field. Improvements include the installation <br /> of stormwater pipe, drainage inlets, a concrete driveway, and a shell roadway. <br /> ARTICLE 2 -THE PROJECT <br /> 2.01 The Project for which the Work under the Contract Documents may be the whole or only a <br /> part is generally described as follows: <br /> Project Name: SOUTH COUNTY PARK GENERAL USE FIELD <br /> County Project Number: 1425 <br /> Bid Number: 2016048 <br /> Project Address: 1590 9t'Street SW (Oslo Road) <br /> Vero Beach, Florida 32962 <br /> ARTICLE 3— ENGINEER <br /> 3.01 The Indian River County Public Works Department is hereinafter called the ENGINEER <br /> and will act as OWNER's representative, assume all duties and responsibilities, and have <br /> the rights and authority assigned to ENGINEER in the Contract Documents in connection <br /> with the completion of the Work in accordance with the Contract Documents. <br /> ARTICLE 4 - CONTRACT TIMES <br /> 4.01 Time of the Essence <br /> A. All time limits for Milestones, if any, Substantial Completion, and completion and readiness <br /> for final payment as stated in the Contract Documents are of the essence of the Contract. <br /> 4.02 Days to Achieve Substantial Completion, Final Completion and Final Payment <br /> A. The Work will be substantially completed on or before the 120TH calendar day after the <br /> date when the Contract Times commence to run as provided in paragraph 2.03 of the <br /> General Conditions, and completed and ready for final payment in accordance with <br /> 00520-Agreement(Public Works)REV 06-14 <br /> 00520-2 <br /> F,\Purchasing\Bids\2015-2016 FY(2016000)\2016048-South County Field\00520-Agreement(Public Works)REV 06-14.doc <br />