My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2016-132A
CBCC
>
Official Documents
>
2010's
>
2016
>
2016-132A
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/17/2016 10:45:45 AM
Creation date
10/17/2016 10:45:14 AM
Metadata
Fields
Template:
Official Documents
Official Document Type
Contract
Approved Date
09/13/2016
Control Number
2016-132A
Agenda Item Number
8.L.
Entity Name
Guettler Brothers Construction
Subject
South County Park Gereral Use Field
Area
South County Park
Project Number
1425
Bid Number
2016048
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
236
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
17. Drawings—That part of the Contract 27 Milestone—A principal event specified in <br /> Documents prepared or approved by ENGINEER the Contract Documents relating to an intermediate <br /> which graphically shows the scope, extent, and completion date or time prior to Substantial Comple- <br /> character of the Work to be performed by tion of all the Work. <br /> CONTRACTOR. Shop Drawings and other <br /> CONTRACTOR submittals are not Drawings as so 28. Notice of Award—The written notice by <br /> defined. OWNER to the apparent successful bidder stating that <br /> upon timely compliance by the apparent successful <br /> 18. Effective Date of the Agreement—The bidder with the conditions precedent listed therein, <br /> date indicated in the Agreement on which it becomes OWNER will sign and deliver the Agreement. <br /> effective, but if no such date is indicated, it means the <br /> date on which the Agreement is signed and delivered 29. Notice to Proceed—A written notice given <br /> by the last of the two parties to sign and deliver. by OWNER to CONTRACTOR fixing the date on <br /> which the Contract Times will commence to run and <br /> 19 ENGINEER—The individual or entity on which CONTRACTOR shall start to perform the <br /> named as such in the Agreement. Work under the Contract Documents. <br /> 20. ENGINEE=R�s Consultant An individual o 30. OWNER—The individual, entity, public <br /> entity having a nnntrnnt with ENGINEER to furnish body, or authority with whom CONTRACTOR has <br /> see Wines as ENGINEER's iRdenenden+ Fefessienal entered into the Agreement and for whom the Work is <br /> to be performed <br /> who is identified as sash in the Supplementa.T <br /> Conditions. 31. Partial Utilization—Use by OWNER of a <br /> substantially completed part of the Work for the pur- <br /> 21. Field Order—A written order issued by pose for which it is intended (or a related purpose) <br /> ENGINEER which requires minor changes in the prior to Substantial Completion of all the Work. <br /> Work but which does not involve a change in the <br /> Contract Price or the Contract Times. 32. PCBs—Polychlorinated biphenyls. <br /> 22. General Requirements—Sections of 33. Petroleum—Petroleum, including crude oil <br /> Division 1 of the Specifications. The General or any fraction thereof which is liquid at standard <br /> Requirements pertain to all sections of the Specifica- conditions of temperature and pressure (60 degrees <br /> tions. Fahrenheit and 14 7 pounds per square inch <br /> absolute), such as oil, petroleum, fuel oil, oil sludge, oil <br /> 23. Hazardous Environmental Condition—The refuse, gasoline, kerosene, and oil mixed with other <br /> presence at the Site of Asbestos, PCBs, Petroleum, non-Hazardous Waste and crude oils. <br /> Hazardous Waste, or Radioactive Material in such <br /> quantities or circumstances that may present a 34. Project—The total construction of which <br /> substantial danger to persons or property exposed the Work to be performed under the Contract <br /> thereto in connection with the Work. Documents may be the whole, or a part as may be <br /> indicated elsewhere in the Contract Documents. <br /> 24. Hazardous Waste—The term Hazardous <br /> Waste shall have the meaning provided in Section 35. Project Manual—The bound documentary <br /> 1004 of the Solid Waste Disposal Act (42 USC information prepared for bidding and constructing the <br /> Section 6903)as amended from time to time. Work. A listing of the contents of the Project Manual, <br /> which may be bound in one or more volumes, is <br /> 25. Laws and Regulations; Laws or Regulat- contained in the table(s)of contents. <br /> ions—Any and all applicable laws, rules, regulations, <br /> ordinances, codes, and orders of any and all govem- 36. Radioactive Material—Source, special <br /> mental bodies, agencies, authorities, and courts nuclear, or byproduct material as defined by the <br /> having jurisdiction. Atomic Energy Act of 1954 (42 USC Section 2011 et <br /> seq.)as amended from time to time <br /> 26. Liens—Charges, security interests, or <br /> encumbrances upon Project funds, real property, or 37. Resident Project Representative—The <br /> personal property authorized representative of ENGINEER who may be <br /> assigned to the Site or any part thereof. <br /> 00700-General Conditions REV 510-13 <br /> 00700-6 <br /> F(Public WorksIENGINEERING DNISION PROJECTS\1425 S County Park-General Use Field%Adminlbid documentsXMaster Contract Documents\D0700-General Conditions REV 51D- <br /> 13.doc <br />
The URL can be used to link to this page
Your browser does not support the video tag.