My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
08/16/2016 (4)
CBCC
>
Meetings
>
2010's
>
2016
>
08/16/2016 (4)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/26/2018 10:57:42 AM
Creation date
10/25/2016 1:02:40 PM
Metadata
Fields
Template:
Meetings
Meeting Type
BCC Regular Meeting
Document Type
Agenda
Meeting Date
08/16/2016
Meeting Body
Board of County Commissioners
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
806
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
RFI 2016047 <br />Perform a replacement of all consoles with Symphony consoles and requisite switch that allows for a <br />network interoperable connection between the existing EDACS system and the new P-25 system. <br />Interface an existing Migration Gateway to the existing EDACS IMC to the new Vida core switch. This <br />stage of the migration will be in use for at least several years to allow for budget cycle funding of user <br />equipment. All new user equipment will be capable of operating in the EDACS and P-25 Phase II mode to <br />allow full featured support required for the interim system configuration. The proposer will be required <br />to guarantee that the new equipment will be compatible with all functionality of existing <br />communications infrastructure. <br />• Interface four (4) channel five (5) sites of P-25 Phase II with an existing County EDACS system for parallel <br />operations as mentioned above. The intent is to effect a smooth and reliable interoperation between <br />the two systems while agencies continue to budget and purchase compatible equipment. <br />• During the user migration period, additional sites will be evaluated; and, if required, implemented into <br />the system expansion. A strong emphasis is placed on no disruption of service, which is paramount. <br />Severe penalties will be placed on failure to perform to a public safety grade of service. <br />• Implementation of a Be -On network with the associated licenses and peripheral systems will be <br />provided. The required factory knowledge and familiarity with this product will be required for <br />integration into the P-25 and EDACS system. <br />• Eventually, additional channels will be added to the P-25 system. This will provide for capacity with <br />system usage and eventual migration to the Phase II P -2S. <br />• All vendors' engineers and technicians shall work with the existing radio service provider during the <br />cutover and shall correct any issues that occur immediately as to not disrupt radio traffic. Cutovers <br />should be coordinated during non -peak radio traffic hours to minimize any foreseen downtime. The cost <br />of this shall be the responsibility of the provider. <br />• Proposers must have a minimum of 8 years of hands-on experience, factory training and certification <br />with the referenced equipment. Multiple references will be required to substantiate qualifications. <br />• Vendors shall provide technical support available on site 24/7/365 within a one (1) hour notice of <br />disruption and effect a repair within four (4) hours. This shall apply to each and every subset of <br />equipment provided in this project and to any product into with which the radio system must interface. <br />• As this is a public safety radio system, all work shall be conducted with no disruption of service. The <br />proposer shall be responsible for all costs and liquidated damages associated with any disruption of <br />service and any remedial effort needed to restore system to full operation. <br />The County anticipates a phased replacement of the existing system over a five-year period. It is anticipated that <br />the end using entities will purchase their own radios separately. <br />Page 2 of 4 <br />174 <br />
The URL can be used to link to this page
Your browser does not support the video tag.