My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
08/16/2016 (4)
CBCC
>
Meetings
>
2010's
>
2016
>
08/16/2016 (4)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
10/26/2018 10:57:42 AM
Creation date
10/25/2016 1:02:40 PM
Metadata
Fields
Template:
Meetings
Meeting Type
BCC Regular Meeting
Document Type
Agenda
Meeting Date
08/16/2016
Meeting Body
Board of County Commissioners
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
806
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
authorized and executed by both the Consultant and the COUNTY shall become an <br />amendment to this Agreement. <br />1.3 A schedule of current hourly billing rates is set forth in Exhibit 1 attached <br />to this Agreement and made a part hereof by this reference. These hourly billing rates <br />will remain effective for the duration of this Agreement. <br />1.4 The Background Recitals are true and correct and form a material part of <br />this Agreement. <br />2. SCOPE OF SERVICES <br />2.1 This Project involves the design, construction, and operation of a pilot <br />plant study whose critical function is to develop final design data to be used by the <br />County to design a full-scale Managed Aquatic Plant stormwater/groundwater seepage <br />pollution removal system. The water source will be the Indian River Farms Water <br />Control District's (IRFWCD) North Relief Canal. The full-scale system will be designed <br />to remove a minimum of 4,000 pounds total phosphorus per year and a minimum of <br />20,700 pounds of total nitrogen per year from North Relief Canal water. The Project's <br />required end products are a recommended Managed Aquatic Plant System treatment <br />process and final design parameters for the recommended process. <br />2.2 A detailed Scope of Services is presented in Exhibit 2 attached to this <br />Agreement and made a part hereof by this reference. <br />3. COUNTY OBLIGATIONS <br />3.1 The COUNTY will provide the Consultant with a copy of any preliminary <br />data or reports available as required in connection with the Work to be performed under <br />this Agreement, together with all available drawings, surveys, right-of-way maps, and <br />other documents in the possession of the COUNTY pertinent to this Project. The <br />Consultant shall satisfy itself as to accuracy of any data provided. The Consultant is <br />responsible for bringing to the COUNTY's attention, for the COUNTY's resolution, <br />material inconsistencies or errors in such data that come to the Consultant's attention. <br />3.2 The COUNTY shall arrange for access to, and make provisions for the <br />Consultant to enter upon, public and private property (where required) as necessary for <br />the Consultant to perform its Services, upon the timely written request of Consultant to <br />COUNTY. <br />3.3 The COUNTY shall promptly execute and pay for all permit applications <br />necessary to the Project. <br />3.4 The COUNTY shall examine any and all studies, reports, sketches, <br />drawings, specifications, proposals and other documents presented by the Consultant, <br />and render, in writing, decisions pertaining thereto within a reasonable time. <br />2 <br />C:WsersNatt Van EitZ"ktop\IRC VEN AS_RB Project'Budget and SOw\SOw and Budget Revision Aug=MMAPS <br />Agreement.doc <br />252 <br />
The URL can be used to link to this page
Your browser does not support the video tag.