Laserfiche WebLink
Florida Statutes: 850-035-01 <br /> 334.044(7) PAVEMENT MANAGEMENT <br /> OGC—02/15 <br /> Page 15 of 20 <br /> Exhibit A <br /> SCOPE OF WORK <br /> DELIVERABLES <br /> 581h Avenue from North of 261h Street to North of 57' Street <br /> FM#434840-1-54-01 <br /> This Project will consist of reconstructing the roadway utilizing full depth reclamation,milling,widening <br /> the existing asphalt and constructing a 1-1/2" thick asphalt overlay.The Project work will also <br /> include, but is not limited to the reconstruction of the existing shoulders to 5-feet, minor drainage <br /> improvements,utility adjustments,signing,and pavement markings. <br />