Laserfiche WebLink
and attend a pre-application/site meeting with FDEP staff as suggested in their notice of <br />permit renewal. <br />Consultant will prepare all applicable applications to maintain the existing rated capacity. <br />Application forms including 62-620.910(1) and 2DC 62-620.910(18) forms will be <br />prepared and submitted along with supporting tables, graphs, and process flow diagram. <br />Consultant will update the existing engineering report prepared for the previous up- <br />rating. <br />Consultant will prepare a list of data and documentation needed for the preparation of the <br />permit renewal application. Information such as background water quality data, <br />treatment plant water quality, MOR's, daily plant flow data, non-compliance notices, <br />historical concentrate water characteristic data, etc., as a minimum, will be provided by <br />IRCU for use in preparing the permit application. <br />The following parameters are included as part of the existing operating permit and will be <br />reviewed as part of the permit application. Several of these parameters are measured at <br />multiple locations within the ATS treatment system. Where practical and if desired, the <br />frequency and/or elimination of testing will be requested in the permitting process. <br />• Flow <br />• pH <br />• Phosphorus (Total) <br />• Nitrogen (Total) <br />• Ammonia Nitrogen <br />• Hydrogen Sulfide <br />• Dissolved Oxygen <br />• Fluoride <br />• Conductivity (Salinity) <br />Chlorine <br />Temperature <br />CBOD5 (removed from testing) <br />Mercury <br />Copper <br />Gross Alpha <br />Radium 226/228 <br />Fecal coliform (removed from testing) <br />Acute Toxicity (Daphnia water fleas, fathead <br />minnows) <br />Consultant will rely on the calculations for Total Daily Mass Load (TMDL) and ATS <br />system performance as outline in the permit. <br />A condition of the permit allows a reduction in monitoring frequency of acute toxicity to <br />every six months, which Consultant will review as part of the permit renewal, if the data <br />supports this request. <br />Consultant will prepare a draft application with supporting tables, graphs, trends, and <br />explanations to the permit application renewal and submit draft copies to IRCU staff for <br />review one month prior to submittal deadline. Consultant will attend a review meeting to <br />discuss the draft application and supporting information, and revise the permit application <br />based on comments developed in review meeting. <br />It is assumed that only minor adjustments to the best management plan and standard <br />operating protocols will need to be provided, and Consultant will update the existing Best <br />KAWPB_Civil\044572030 - IRCU Oncall\Scope\South County Demineralization Permit Renewal 2016 REV2.docx <br />Page 2 of 3 <br />139 <br />