My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
09/13/2016
CBCC
>
Meetings
>
2010's
>
2016
>
09/13/2016
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/8/2020 12:06:32 PM
Creation date
11/7/2016 12:40:13 PM
Metadata
Fields
Template:
Meetings
Meeting Type
BCC Regular Meeting
Document Type
Agenda Packet
Meeting Date
09/13/2016
Meeting Body
Board of County Commissioners
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
291
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
STATE OF FLORIDA DEPARTMENT OF TRANSPORTATION 525-01040 <br />LOCAL AGENCY PROGRAM AGREEMENT PROGRAM MANAGEMENT <br />occ . 08!15 <br />Page 1 <br />EXHIBIT "A" <br />PROJECT DESCRIPTION AND RESPONSIBILITIES <br />FPN: 431725-2-58/68-01 <br />This exhibit forms an integral part of the Local Agency Program Agreement between the State of Florida, Department of <br />Transportation and <br />Indian River County <br />PROJECT LOCATION: <br />❑ The project is on the National Highway System. <br />❑ The project is on the State Highway System. <br />PROJECT LENGTH AND MILE POST LIMITS: 0.673 Miles <br />PROJECT DESCRIPTION: 43rd Ave. Sidewalk Improvements from Aviation Blvd. to Airport Dr. West. <br />SPECIAL CONSIDERATIONS BY AGENCY: <br />- The audit r pa7t(s) r quer e - eement shalli-awAude-a - u e -o ojec# Assistance that -wiN refleet the <br />Department's contract number, the Financial Project Number (FPN), the Federal Authorization Number (FAN), where <br />applicable, the amount of state funding action (receipt and disbursement of funds), any federal or local funding action, and <br />the funding action from any other source with respect to the project. <br />The Agency is required to provide a copy of the design plans for the Department's review and approval to coordinate <br />permitting with the Department, and notify the Department prior to commencement of any right-of-way activities. <br />The Agency shall commence the project's activities subsequent to the execution of this Agreement and shall perform in <br />accordance with the following schedule: <br />a) Study to be completed by N/A . <br />b) Design to be completed by N/A <br />c) Right -of -Way requirements identified and provided to the Department by N/A <br />d) Right -of -Way to be certified prior to advertising for construction (All Phase 58 LAPS) <br />e) Construction contract to be let by 1/12/2017. <br />0 Construction to be completed by 12/31/2018. <br />If this schedule cannot be met, the Agency will notify the Department in writing with a revised schedule or the project is <br />subject to the withdrawal of federal funding. <br />SPECIAL CONSIDERATIONS BY DEPARTMENT: N/A <br />72 <br />
The URL can be used to link to this page
Your browser does not support the video tag.