Laserfiche WebLink
Photos Taken April 1, 2015 <br /> T <br /> w <br /> Ts <br /> Figure 1- Berm on N. side of Figure 2-ESI inspecting Dorm Figure 3 - IRC 5 swab sample, top <br /> Bldg. furnace of ceiling tile Ready Room HVAC <br /> supply <br /> . 4. <br /> Figure 4- Dorm -water stained ceiling tile associate Figure 5 - ESI collecting sample top of Ready Room <br /> with roof flashing issue due to be repaired HVAC supply <br /> t - <br /> �2 <br /> Figure 6 - IRC 6 swab sample of SVG N wall of Office Figure 7- Berm on S. side of Bldg. <br /> A-1 <br /> 8 <br />