My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2016-195
CBCC
>
Official Documents
>
2010's
>
2016
>
2016-195
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/23/2016 10:57:06 AM
Creation date
11/23/2016 10:57:05 AM
Metadata
Fields
Template:
Official Documents
Official Document Type
First Amendment
Approved Date
11/22/2016
Control Number
2016-195
Agenda Item Number
8.L.
Entity Name
MBV Engineering Inc.
Subject
Amendment No.1 to Work Order No.1
12th Street Watermain Design Contract
Area
12th St. between 20th Ave. & Old Dixie
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
3
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
EXHIBIT 1 <br /> INDIAN RIVER COUNTY DEPARTMENT OF UTILITY SERVICES <br /> 12TH STREET WATER MAIN REPLACEMENT BETWEEN 20TH AVENUE AND OLD <br /> DIXIE HIGHWAY <br /> AMENDMENT NO.1 TO WORK ORDER NO.2 <br /> GENERAL <br /> Previously, MBV Engineering had been authorized by Indian River County to survey and design <br /> watermain improvements along 12th St. from an existing 6" water main on the east side of 20th Ave <br /> to Old Dixie and adjacent residential and commercial properties to the north and south. Through <br /> the design process, additional design alternatives have been presented and reviewed by County <br /> personnel and as such are now being presented to the Board for their consideration. <br /> The proposed design improvement modifications will consist of connection to the larger 16" water <br /> main on the west side of 20"' Ave. and relocate the proposed watermain from the north side of 121h <br /> Street to the south side due to unanticipated field conditions prior to receiving survey. In addition, <br /> existing PVC water mains along 14th Ave, 14"' St and 15th Ave south of 14th St will be utilized as <br /> it has been determined that these mains are relatively newer and do not need replacing as <br /> previously anticipated. This will result in a substantial construction cost savings. Additional <br /> survey and design efforts in addition to providing construction phasing are included in this <br /> additional scope. <br /> As such, MBV Engineering will provide the additional surveying and design services related to <br /> the above activities. <br /> SCOPE OF WORK <br /> The scope of work has been detailed below acid represents the services provided for the above. <br /> 1, Shift the proposed watermain from 20th Ave to 16th Ave from the north side of the road as <br /> designed to the south side of the road. <br /> 1 Connect to the existing 16"watermain on the west side of 20th Ave as opposed to the <br /> existing 6" watermain on the east side. <br /> 3. Provide phasing at 12th Ave, <br /> 4. Utilize the existing 6"watermain that runs from 12t" St north along 14th Ave, then west <br /> on 14th St. Also utilize the existing 6"watermain that runs from 14th St south along 151' <br /> Ave. This is being modified as it was determined that this existing 6"watermain is PVC <br /> and was installed in 1983, and therefore is adequate to remain which will help provide a <br /> significant savings in construction costs. <br /> Page 1 of 2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.