Laserfiche WebLink
unanticipated conditions appear in paragraphs 4.02, 4.03, and 4.04 of the General Conditions. <br /> Provisions concerning responsibilities for the adequacy of data furnished to prospective Bidders <br /> with respect to a Hazardous Environmental Condition at the Site, if any, and possible changes in <br /> the Contract Documents due to any Hazardous Environmental Condition uncovered or revealed at <br /> the Site which was not shown or indicated in the Drawings or Specifications or identified in the <br /> Contract Documents to be within the scope of the Work appear in paragraph 4.06 of the General <br /> Conditions. <br /> 4.05 Upon a request directed to the ENGINEER (Michael D. Nixon, P.E. 772-226-1986), <br /> OWNER will provide Bidder access to the Site to conduct such examinations, investigations, <br /> explorations, tests, and studies as Bidder deems necessary for submission of a Bid. Bidder shall <br /> fill all holes and clean up and restore the Site to its former condition upon completion of such <br /> explorations, investigations, tests, and studies. <br /> 4.06 This paragraph has been deleted intentionally <br /> I <br /> 4.07 It is the responsibility of each Bidder before submitting a Bid to: i <br /> A. examine and carefully study the Bidding Documents, including any Addenda and the other f <br /> related data identified in the Bidding Documents; <br /> i <br /> B. VISIT THE SITE AFTER CONTACTING THE ENGINEER (MICHAEL D. NIXON, P.E., <br /> (772) 226-1986) TO MAKE ARRANGEMENTS IN ADVANCE, AND BECOME FAMILIAR WITH <br /> AND SATISFY BIDDER AS TO THE GENERAL, LOCAL, AND SITE CONDITIONS THAT MAY <br /> AFFECT COST, PROGRESS, AND PERFORMANCE OF THE WORK; <br /> C. become familiar with and satisfy Bidder as to all federal, state, and local Laws and <br /> Regulations that may affect cost, progress, or performance of the Work; 1 <br /> I <br /> D. carefully study all reports of explorations and tests of subsurface conditions at or � <br /> contiguous to the Site and all drawings of physical conditions in or relating to existing surface or <br /> subsurface structures at or contiguous to the Site (except Underground Facilities) which have <br /> been identified in the Supplementary Conditions as provided in paragraph 4.02 of the General i <br /> Conditions, and carefully study all reports and drawings of a Hazardous Environmental Condition, <br /> if any, at the Site which have been identified in the Supplementary Conditions as provided in <br /> paragraph 4.06 of the General Conditions; <br /> E. obtain and carefully study (or assume responsibility for doing so) all additional or <br /> supplementary examinations, investigations, explorations, tests, studies, and data concerning <br /> conditions (overhead, surface, subsurface, and Underground Facilities) at or contiguous to the <br /> Site which may affect cost, progress, or performance of the Work or which relate to any aspect of <br /> the means, methods, techniques, sequences, and procedures of construction to be employed by <br /> Bidder, including any specific means, methods, techniques, sequences, and procedures of <br /> construction expressly required by the Bidding Documents, and safety precautions and programs <br /> incident thereto; <br /> F. agree at the time of submitting its Bid that no further examinations, investigations, <br /> explorations, tests, studies, or data are necessary for the determination of its Bid for performance <br /> of the Work at the price bid and within the times and in accordance with the other terms and <br /> conditions of the Bidding Documents; <br /> G. become aware of the general nature of the work to be performed by OWNER and others <br /> at the Site that relates to the Work as indicated in the Bidding Documents; <br /> 00200-Instructions to Bidders FOR LAP PROJECTS ONLY REV 08-10 <br /> 00200-3 <br /> F:1Public WorkMENGINEERING DIVISION PROJECTS11049_8lh St Sidewalk Improvements(58th Ave to 21st Court)\Admimtbid documents\LAP Documents=200- <br /> instructions to Bidders FOR LAP PROJECTS ONLY REV 08-10.doc Rev.05101 <br />